Sunday, November 22, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

Tuchel: Chelsea FC’s recruitment plans behind schedule

Freedom Reporter by Freedom Reporter
April 28, 2022
in Breaking News, News, Sports
0
Tuchel’s first game as Chelsea manager ends in draw, Burnley win

Thomas Tuchel

Share on FacebookShare on TwitterShare on Whatsapp

Chelsea FC  manager,  Thomas Tuchel, said their recruitment plans for next season are running behind schedule due to the uncertainty over the club’s ownership.

He  added that the squad would require only “cosmetic surgery”.

Chelsea were put up for sale by Russian billionaire, Roman Abramovich, following Russia’s invasion of Ukraine, which Moscow calls a “special military operation”.

Sanctions imposed by the British government on Abramovich mean Chelsea are unable to sign new players or renew existing contracts.

Tuchel confirmed at the weekend that Antonio Rudiger would leave after his contract expires, with Andreas Christensen also looking likely to depart.

“You’re never fully sure, but we would have some targets and we would for sure have contacted some players and found out about their situations.

“Now our hands are tied, we can still have the talks inside the building but we cannot act.

“The situation is not ideal. It would be challenging enough with a stable situation. We don’t have that so everyone is doing it for the first time.”

While United’s interim manager Ralf Rangnick said last week that his club needed an “open heart operation” to fix their issues Tuchel gave a more positive outlook for Chelsea.

“Cosmetic surgery,” he responded when asked if Chelsea needed the same. “I would be less concerned if we still had the same ownership, if we could rely on our structure.

“As this is also in question we are, not concerned, but aware of the danger that the situation is maybe a bit more complex.”

Chelsea are third in the Premier League on 65 points from 32 matches, while United are sixth on 54 points from 34 matches. 

Tags: Tuchel: Chelsea FC’s recruitment plans behind schedule
Share25Tweet16Send
Previous Post

APC chief shot dead

Next Post

NASA plans longer stay on Moon, Mars

Next Post
NASA tracks swarm of asteroids zooming toward earth at breakneck speed

NASA plans longer stay on Moon, Mars

2023: Sowore for President

AAC declares Expression of Interest, Nomination forms free

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

Motsepe and Infantino

CAF records $31.2m profit, revenue exceeds $284m; adopts Kiswahili as fifth official language, backs Infantino’s re-election

November 22, 2026

EPL: Leeds record historic huge win as Arsenal, Man City drop points

November 22, 2026

Succession crisis in Nigerian churches: Matters arising, by Bolanle Bolawole

November 22, 2026

High Volume of Election Litigations Not Translated Into Widespread Vindication–Appeal Court Justice 

November 22, 2026

Anambra CityBoy Members Threaten Mass Exit Over Leadership Crisis Ahead of 2027

November 21, 2026

2027 WASSCE: Ondo Government Cracks Down on Miracle Centres and Exam Fraud

November 21, 2026

FIFA President’s Warri Visit Boosts Oborevwori’s Sports Development Agenda, Says Timi

November 21, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.