Tuesday, November 24, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

FG to Start Repair of Kara Bridge Expansion Joints on Lagos–Ibadan Expressway March 10

Robert Imoh by Robert Imoh
March 7, 2026
in News
0
Share on FacebookShare on TwitterShare on Whatsapp

The Federal Government of Nigeria has announced plans to begin maintenance work on damaged expansion joints on Kara Bridge along the Lagos-Ibadan Expressway starting from March 10.

The Federal Controller of Works in Ogun State, Olayiwola Komolafe,  disclosed this in a statement issued in Lagos.

According to Komolafe, the repairs will focus on the section of the bridge located on the outbound carriageway from Lagos, specifically between Chainage 5+350 and 6+115.

He explained that the project, approved by the Dave Umahi, Nigeria’s Minister of Works, will run for two weeks, beginning on March 10 and ending on March 24.

During the repair period, part of the road will be temporarily closed to traffic, resulting in reduced lane width for vehicles travelling out of Lagos.

The Ministry of Works said the maintenance is necessary to replace the worn-out expansion joints and ensure the long-term safety and durability of the bridge.

Motorists have been advised to make adequate travel plans ahead of time and consider alternative routes to minimise traffic delays.

Komolafe recommended that drivers heading from Ikorodu to Mowe Sagamu, or Ibadan should consider passing through Shimawa or Mosinmi.

For travellers leaving Lagos Island ,he suggested using the Epe corridor and continuing through Ijebu Ode to connect with Sagamu, Ibadan or Mowe.

However, he cautioned that taking a shorter route may not necessarily translate to faster travel during the maintenance period

Komolafe urged motorists to follow traffic management instructions around the construction zone and drive carefully to avoid accidents.

He also apologised for the inconvenience the temporary partial closure might cause and appealed to road users for patience and cooperation while the repairs are being carried out.

Share25Tweet16Send
Previous Post

Govt bans VIOs from road operations

Next Post

FG to begin repairs on Kara Bridge expansion joints March 10

Next Post

FG to begin repairs on Kara Bridge expansion joints March 10

Police

Police Launch Investigation into Arson Attack on ADC Office in Rivers

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

Curfew

Attempted assassination on Omo-Agege: Delta Govt imposes curfew

November 23, 2026
Omo Agege

Bloody Day in Delta: Four shot dead as gunmen attack Omo-Agege’s convoy

November 23, 2026

Ambassador Isola hails Ogun APC Chairman, Yemi Sanusi, at 73

November 23, 2026
Dangote

Dangote emerges recipient of 2026 Obafemi Awolowo Prize for Leadership

November 23, 2026

Political Scientists Warn Against Executive-Legislative Conflict in Nigeria

November 23, 2026

Bayelsa Community Raises Alarm Over Suspected Mpox Outbreak

November 23, 2026

Pete Edochie Praises Yul’s Restraint Amid May Marriage Crisis

November 23, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.