Tuesday, November 3, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

FG to begin repairs on Kara Bridge expansion joints March 10

Femi Adewale by Femi Adewale
March 7, 2026
in Breaking News
0
Share on FacebookShare on TwitterShare on Whatsapp

The Federal Government says repair works on damaged expansion joints on Kara Bridge along the Lagos-Ibadan Expressway will begin on March 10.

The Federal Controller of Works in Ogun State, Mr Olayiwola Komolafe, disclosed this in a statement on Saturday.

He said the maintenance work would take place on Kara Bridge outbound Lagos between Chainage 5+350 and 6+115.

Komolafe said the repair works, directed by the Minister of Works, Sen. Dave Umahi, would last two weeks and end on March 24.

According to him, there will be a partial closure of the affected section during the period, resulting in a narrowed road width for vehicles travelling outward Lagos.

The ministry said the measure was necessary to enable engineers to replace the damaged expansion joints and ensure the safety and durability of the bridge.

He advised motorists to plan their journeys ahead and consider alternative routes to reduce traffic congestion during the repair period.

“Motorists travelling from Ikorodu to Mowe, Sagamu and Ibadan are advised to go through Shimawa or Mosinmi.

“Those travelling from Lagos Island may explore the Epe corridor through Ijebu Ode to connect Sagamu, Ibadan and Mowe,” he advised.

Komolafe, however, noted that a shorter route may not necessarily be the fastest during the repair works.

He urged motorists to obey traffic management directives and drive cautiously around the work zone.

The controller expressed regret over any inconvenience the temporary partial closure might cause and appealed for the understanding and cooperation of road users.

Tags: FG to begin repairs on Kara Bridge expansion joints March 10
Share25Tweet16Send
Previous Post

FG to Start Repair of Kara Bridge Expansion Joints on Lagos–Ibadan Expressway March 10

Next Post

Police Launch Investigation into Arson Attack on ADC Office in Rivers

Next Post
Police

Police Launch Investigation into Arson Attack on ADC Office in Rivers

National Theatre

EFCC hands over recovered N279m to Wole Soyinka Centre

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

NNPP Sues INEC, 45 Lawmakers Over Defection, Seeks Vacant Seats

November 3, 2026

DSS Asks Court to Reject Sowore’s Bid to Summon Lead Prosecutor

November 3, 2026
Police

Ondo Police Bust Suspected Fake Dollar Factory, Arrest One Over $6,000 Fraud

November 3, 2026

South Africa Faces Job Losses as US Ends AGOA Trade Benefits in 2027

November 3, 2026

State Police Bill: 28 States Approve Amendment as NASS Moves to Tinubu

November 3, 2026

CAF Awards 2026: No Nigerian Nominated for Women’s Player of the Year

November 3, 2026

Nigeria Records 2,512 Terrorism Convictions, Targets Financiers and Collaborators

November 3, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.