Sunday, March 15, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

FG to complete 25 km makeshift road on Lagos-Ibadan highway this month

Freedom Reporter by Freedom Reporter
January 15, 2014
in Breaking News, Featured
0

Lagos_Ibadan_expresswayThe Federal Government is to complete construction of the makeshift 25-km road on the Lagos-Ibadan highway this month, an official of the Federal Ministry of Works announced on Wednesday.

Mr Godwin Eke, who is a Deputy Director in the ministry made the announcement in an interview with the News Agency of Nigeria (NAN).

He said that the construction of the makeshift road was to divert vehicles, noting that work would continue on the main carriageway of the road.

The deputy director said that the old road would be completely removed to give way for the new project, adding that milling of the road would be done in sections.

“The entire road would be milled but it would be section by section.

“First, the contractor, Julius Berger has to plan diversion while working on the carriageway, what we are doing now is temporary diversion so that the main work would start.’’

He explained that five kilometres of the makeshift road had been constructed on the Ibadan-bound section of the road and was currently being extended by another five kilometres.

Eke explained that five kilometres was also being constructed on the Lagos-bound carriageway, starting from the Shagamu Interchange.

The deputy director said that a total of 25 kilometres would be constructed by the end of January.

He said, however, that all the constructions were temporary and that permanent construction would soon begin on the Lagos-bound section starting from Shagamu.

Eke who is the officer in charge of section one reconstruction of the highway, said that diversion signs would be placed 100 metres from the constructed portions to guide those coming to Lagos from Abeokuta and other areas.

He said that construction of the permanent road would begin from the Shagamu Interchange because of high traffic on the Lagos side, adding that, a traffic management plan was being concluded and “would be ready this week”.

He lamented that high traffic and reckless driving were slowing down work on the highway.

“Lagos-bound traffic is where we have most of the problems,’’ he said.

A correspondent who made a trip on the road reports that crushed stone bases were laid on the Ibadan-bound carriageway from around the Redeemed Christian Church of God area up to the Shagamu Interchange.

Median barriers were also used to demarcate the road to serve as diversion routes.

Previous Post

Tukur denies daring Jonathan, says he remains National Chairman of PDP

Next Post

Court sacks Umeh’s APGA faction

Next Post
APGA

Court sacks Umeh’s APGA faction

Customs get six new DCGs, 11 ACGs

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

PDP Senator Dumps Party for ADC Ahead of 2027 Elections

March 14, 2026
PDP

PDP Crisis Deepens as Turaki-Led Leadership Rejects Dissolution of Three State Executives

March 14, 2026

Nigeria Football Legend Henry Nwosu Dies at 62

March 14, 2026

Newly-appointed adviser on political economy, Bala Bello, thanks Tinubu, pledges loyalty

March 14, 2026

Lagos to Ban School-Age Children From Streets During School Hours

March 14, 2026
Henry Nwosu

Henry Nwosu is dead, Odegbami mourns

March 14, 2026

35-year-old man killed, wife abducted

March 14, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.