Monday, April 20, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

Port Harcourt, Warri Refineries commence preliminary production, says NNPC

Freedom Online by Freedom Online
July 29, 2015
in Breaking News, Business, Energy, News
0
DPR to grant NDPR licence to operate 1000bpd modular refinery

Refinery

Port Harcourt and Warri refineries have commenced preliminary production of petroleum products after successful test-runs.
This was revealed in a statement by the Group General Manager, Group Public Affairs Division of the Nigerian National Petroleum Corporation (NNPC), Mr Ohi Alegbe, in Abuja on Wednesday.
The statement explained that this followed successful re-streaming after a nine-month phased rehabilitation by in-house engineers and technicians.
It stated that PHRC was ramping up its operation to about 60 per cent of its 210,000 barrels per day name plate capacity.
According to the statement, WRPC production is projected to hit 80 per cent of its installed 125,000 bpd capacity.
It stated that the PHRC was projected to boost the nation’s local refining capacity with a product yield of five million litres of petrol per day.
It added that Warri Refinery would contribute 3.5 million litres of petrol to local refining capacity.
The statement explained that NNPC adopted the phased rehabilitation after the Original Refinery Builders (ORB), who were initially contacted for the project, came up with unfavorable terms.
It explained that a decision was taken in 2011 to rehabilitate all the refineries using the ORB of each of the refineries.
“We were impelled to switch strategy after the ORBs declined participation and nominated some partners in their stead who came up with outrageously unfavorable terms’’, it stated.
It stressed that the nominated partners, as sole-bidders, came up with humongous price offers after two years of thorough and exhaustive scope of work definition and price negotiations.
It explained that the proxies were also unwilling to provide post rehabilitation performance guarantees.
“The phased rehabilitation strategy entailed phased and simultaneous rehabilitation of all refineries using in-house and locally available resources in line with the spirit and letter of the Nigerian Content Law.
“It also involved the use of Original Equipment Manufacturer representatives to effect major equipment overhaul and rehabilitation.’’
It stated that the phased rehabilitation, which started in October 2014 after the required funding stream was established, created a 70-per cent reduction in costs.
It said this had helped largely in mitigating the financing challenge of refinery rehabilitation.
It stated that with the successful re-streaming of the PHRC and WRPC, attention had moved to the 110,000 barrels per day Kaduna Refining and Petrochemicals Company (KRPC).
According to the statement, the KRPC is billed to come on stream soon.

Previous Post

Profiteering: DPR seals Oando, 21 other filling stations in Abuja

Next Post

Island Club members visit Ambode

Next Post

Island Club members visit Ambode

Power surge destroys properties in Oyo community

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

Daniel

Why Otunba Gbenga Daniel remains the most suitable candidate for Ogun East Senate seat

April 20, 2026

APC Crisis Looms in Abia Over Early Governorship Endorsement

April 20, 2026

Experts Call for State Police as Insecurity Worsens in Northern Nigeria

April 20, 2026

NCS First Female Pilot Nafisat Balogun Earns U.S. Commercial Licence

April 20, 2026

Katsina Children Raise Alarm Over Climate Threats in Schools

April 20, 2026
Police

Police Investigate Fatal Hotel Stampede in Ekiti

April 20, 2026

Turkish Airlines, Air Peace Sign Deal to Boost Global Connectivity

April 20, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.