Saturday, March 14, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

Lagos–Calabar Coastal Highway already serving purpose – FG

Robert Imoh by Robert Imoh
January 11, 2026
in News
0

The Lagos-Calabar Coastal Highway is already serving its purpose as the Federal Government intensifies efforts to complete its Section One, the Minister of Works, Sen. Dave Umahi, has said.

 

Umahi made the remark on Saturday during an inspection tour of the project.

 

“I am very eager to see how we can fully complete this Section One by April this year, so that we can have it fully commissioned – a stretch of Section One and a significant part of Section Two,” he said.

 

He said that in spite of challenges, the contractor handling the project, Hitech Construction Company Ltd., was doing well and determined to beat deadlines.

 

“We are terribly being challenged because of the realignment that we have encountered.

 

‎”What we are witnessing in Kilometer 34 has nothing to compare with what we had in Kilometer 20, where we had a pit of over 25 metres deep, and Hitech was able to remove them and then loaded them with lumps and sharp sand.

 

“I continue to thank Hitech. Lagosians and other Nigerians have been enjoying the road, and I have seen the reason behind the dreams of over 27 years,” Umahi said.

 

‎He said that he would inspect the project every month to be sure that President Bola Tinubu would have it fully inaugurated by the end of April.

 

According to Umahi, the President might also inaugurate about 50% of the Section Two of the highway project in April.

 

“We have not been here since we temporarily opened it for traffic and we are very happy that the coastal road is serving ‎its purpose.

 

‎”I am very happy with what I have seen out of the 47.47 kilometres, excluding the bridges, which are part of the Section Two,” he said.

 

Earlier, the Federal Controller of Works in Lagos, Mr Olufemi Dare, told the Minister that Hitech was encountering challenges at Chainage 34.

 

“We encountered another very deep swampy area here as we can see. We have dredged here and there from 34 to 37, 38,” he said.

 

He, however, said the contractor handling the project was on top of the situation.

 

‎

 

“The dredging operation is ongoing in order to fast-track the process, and whenever we finalise and we push the sand on top of water level, we are continuing with sharp sand as well as stone base.

Previous Post

LP dismisses alleged link between INEC statements, leadership crisis

Next Post

Lagos–Calabar Coastal Highway to be tolled after inauguration — Umahi

Next Post

Lagos–Calabar Coastal Highway to be tolled after inauguration — Umahi

AFCON 2025: Akpabio hails Super Eagles on semi-finals qualification, charges them to bring home the trophy

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

PDP Senator Dumps Party for ADC Ahead of 2027 Elections

March 14, 2026
PDP

PDP Crisis Deepens as Turaki-Led Leadership Rejects Dissolution of Three State Executives

March 14, 2026

Nigeria Football Legend Henry Nwosu Dies at 62

March 14, 2026

Newly-appointed adviser on political economy, Bala Bello, thanks Tinubu, pledges loyalty

March 14, 2026

Lagos to Ban School-Age Children From Streets During School Hours

March 14, 2026
Henry Nwosu

Henry Nwosu is dead, Odegbami mourns

March 14, 2026

35-year-old man killed, wife abducted

March 14, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.