Tuesday, June 2, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

Ikoyi building collapse: Construction began before approval was granted

Abdulah Wahab by Abdulah Wahab
January 12, 2022
in Breaking News, News
0
Five feared dead, many trapped in 21-storey Lagos building collapse; document shows structural violations since 2020

The Lagos State Building Control Agency (LASBCA) said, on Wednesday, before a Coroner’s Inquest to the collapse of the 21-storey building at Gerard Road, Ikoyi, Lagos, that construction of the three high-rise blocks began before provisional approval was granted.

Counsel for LASBCA, Mr A.S Odugbemi, made the assertion while questioning Mr Muritala Olawale, the Managing Director of Prowess Engineering Nigeria Ltd.

Olawale was a consultant structural engineer to the project.

He withdrew his services via a letter dated February 20, 2020 over disputes on how the project was structurally executed.

Odugbemi during proceedings, disputed the contents of paragraph 17 of Olawale’s Statement on Oath to the Inquest.

He stated that the late Mr Femi Osibona, the Managing Director of Fourscore Heights Ltd., contractor to the project, had informed his team that he had received provisional approval for the project’s construction.

According to Olawale’s Statement on Oath, Osibona showed his team a copy of the provisional approval from the Lagos State government and ordered them to commence construction on the site.

Disputing Olawale’s claims, Odugbemi said LASBCA never granted Osibona a provisional planning permit when the team moved to the site to commence construction in January 2019.

He stated that LASBCA granted provisional approval in April 2019.

“Will you be surprised if evidence is provided to you right now that work had started before the provisional planning approval was granted in April 2019?,” Odugbemi asked.

Responding, Olawale said “I will be surprised. All the approval processes were being handled by the client (Osibona).

“I cannot answer the questions right now. I need to check my records.”

Olawale did not give a specific answer to Odugbemi’s query on whether the three high-rise blocks were covered by a general insurance policy as required by law.

He, however, informed the panel that prior to construction, a soil test was conducted at the site by another company contracted to do the job.

“We have submitted the result of the soil test of the site to other panels investigating the collapse,” he said.

Of the three high-rise buildings (Blocks A, B and C), situated on Gerard Road, Ikoyi, Lagos, Block B (21 storeys) collapsed on November 1, 2021 killing 46 persons while 15 persons were rescued alive.

One of the deceased was Osibona.

Tags: Ikoyi building collapse: Construction began before approval was granted
Previous Post

Shonekan: National flags fly at half-mast in public buildings, facilities

Next Post

APC denies shifting National Convention to June

Next Post
APC congress: 36 executives elected by 712 delegates in Gombe

APC denies shifting National Convention to June

Twitter

Twitter: FG lifts suspension

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

Alt="Former Nigerian President Olusegun Obasanjo"

Obasanjo: I have been managing ‘disease with no cure’ for over 40 years

June 1, 2026
NSCDC

NSCDC dismisses report on N2bn traced to its officer’s account (see statement of account)

June 1, 2026

ADC Primary: Hayatu-Deen Rejects Legal Challenge, Calls for Strong Opposition Unity

June 1, 2026
Alt="President Bola TINUBU"

NHF Urges Tinubu Administration to Strengthen Tobacco Control Measures

June 1, 2026

Nigerian Scholar Earns 10 Academic Honours at U.S. University for Health Communication Research

June 1, 2026

Abeokuta Residents Demand Release of Abducted Oyo Schoolchildren

June 1, 2026

CBN Launches Payments System Vision 2028 to Drive Digital Economy Growth

June 1, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.