Wednesday, April 29, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

Ibadan circular road: Makinde frowns at slow pace of 32-kilometre project, halts work

Femi Adewale by Femi Adewale
October 31, 2019
in Breaking News, News
0
Oyo Govt to revoke four road contracts

Road construction

Governor Seyi Makinde of Oyo State, on Thursday, frowned at the slow pace of construction work on the Ibadan Circular road project.
Makinde expressed his disappointment when he made an on-the-spot assessment to the 32 kilometre road to ascertain the level of work done so far by the construction company – ENL Consortium Construction company.
He directed the Executive Director of the company, Mrs Kemi George, to halt continuation of work at the site to enable his government look at the whole contract holistically.
”The pace of construction work on the road is not encouraging; the contract was signed in 2017 and the level of work done so far is 5.5 per cent.
“More so, it is a concession to the tune of N65 billion for a 32 kilometres road.
“We felt there was need to pull back a little bit and look at the whole contract holistically.
“The road is extremely important to the economy of the state and if the contractor could only achieve 5.5 per cent in 3 years and not sure how many years is going to take to finish the project.” Makinde said.
The Circular road project was awarded in 2017 by the administration of Sen. Abiola Ajimobi.
The road project is to link Lagos-Ibadan expressway to Ibadan-Ife road and also to serve as bypass for motorists, thereby ease traffic congestion that characterised Iwo road interchange.

Tags: Ibadan circular road: Makinde frowns at slow pace of 32-kilometre project halts work
Previous Post

Ikoyi Custodial Centre: Aregbesola vows to punish unprofessional personnel

Next Post

Lai Mohammed talks tough, says ‘No going back on enforcing ethical use of social media, airwaves’

Next Post
COVID-19: PTF urges banks, NURTW to comply strictly with guidelines

Lai Mohammed talks tough, says 'No going back on enforcing ethical use of social media, airwaves'

ASUU insists on implementation of existing agreements

IPPIS: ASUU suspends proposed strike

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

Court Closes Defence in Mompha’s N6bn Money Laundering Trial

April 28, 2026

Court Fixes May 8 to Hear Suit Challenging Jonathan’s 2027 Eligibility

April 28, 2026

Lagos Solar Policy Sparks Mixed Reactions Among Residents

April 28, 2026
Naira

NLC: ₦1m monthly salary worthless without stable Naira

April 28, 2026

IPAC Warns Rising Nomination Fees Threaten Nigeria’s Democracy

April 28, 2026

World Bank: Middle East war to spark biggest energy price surge in four years

April 28, 2026

ADC Crisis: Mark Faction Urges CJN to Speed Up Supreme Court Judgment

April 28, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.