Thursday, June 18, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

Flood: Kwara Govt constructs cross-culvert at Irewolede

Gbemi Banks by Gbemi Banks
April 30, 2023
in News, Production
0
The Kwara Government has began the construction of cross-culverts at the Irewolede road to control flood.
To fast track the project, the state Ministry of Works and Transportation has announced a temporary closure of a section of the road to provide  adequate channels to accommodate flood water in the axis.
This is contained in a statement issued by the state Commissioner for Works and Transport, Mr Suleiman Iliasu, on Saturday in ilorin.
“The temporary closure is to protect workers from the traffic as well as shield motorists from the potential hazards of a construction site.
“We call for patience and understanding of members of the public.
“While work begins on this road, we plead with road users to use the Customs Road, Stadium Road, Asa-Dam Road, Coca-Cola Road and Taiwo Road.
“Once again, we appeal to residents and road users to be patient.
“We regret the inconveniences this work may cause. It is for the safety of the general public and smoother road travel within the axis,” the government said.
The statement added that government has also ordered the contractor handling the Adeta Primary School Road back to the site to fix some sections of the road that have failed.
It said the contractor has seven days to return to the site or risk being blacklisted, especially that officials had earlier raised red flags about the quality of his job.
“The retention period has not lapsed, and the contractor has not been fully paid for the job as part of the standard measures to protect public interest,” it explained.
The statement said the ministry has also taken note of complaints on some other roads recently affected by flooding, but urged residents to avoid blocking drainages.
“A culture of dumping wastes into drainages is an unfortunate thing that damages our roads.
“No matter how good a road is, it needs a free flow of water for durability.
“This is often a problem because people are fond of messing up our drainages in spite of the daily advocacy, but we will not be tired,” it assured.
Tags: Irewolede RoadMr Suleiman IliasuThe Kwara Government
Previous Post

Rotary alumni conducts medical outreach in Jos PHC

Next Post

NFF to install VAR in regional stadium – Gusau

Next Post

NFF to install VAR in regional stadium – Gusau

30th Anniversary: Kwara Governor felicitates Alofa of Iloffa

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

APC to boycott Oyo council poll

June 18, 2026
Awujale

Awujale throne: Olisa, kingmakers nominate five princes, send names to Governor Abiodun (see nominees)

June 18, 2026

Salami Dynasty to hold 40 Days prayer for late Shamusideen

June 18, 2026
Oyebanji

Ekiti APC primary dispute: Appeal Court affirms Oyebanji’s candidacy

June 18, 2026

South Africa Hold Czechia 1–1 After Mokoena Penalty in 2026 World Cup Clash

June 18, 2026
Awolowo

Parties are built, not bought, by Babafemi Ojudu

June 18, 2026

SportyTV Now Available on DStv and GOtv Across Africa, Expands Sports Coverage

June 18, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.