Saturday, August 8, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

FG Debunks Viral Claim of Vandalism at Alakija Interchange Bridge in Lagos

Robert Imoh by Robert Imoh
August 8, 2026
in News
0

The Federal Ministry of Works has dismissed reports alleging that vandals were dismantling parts of the Alakija Interchange Bridge along the Lagos-Badagry corridor.

A delegation from the ministry inspected the bridge site in Lagos on Saturday following a viral social media video which claimed that scavengers were removing components from the bridge infrastructure.

The inspection was carried out on the directive of the Minister of Works, Dave Umahi, with officials of the Lagos State Ministry of Works and Infrastructure and other stakeholders participating.

Officials explained that structures shown in the viral footage as allegedly damaged bridge columns were actually piles undergoing an approved engineering process.

Balogun Abdurrahman, an official of the Lagos State Ministry of Works and Infrastructure, explained that the rough appearance of the structures was expected because the piles were originally designed to remain below ground level.

He said a working platform had been constructed around the piles to allow contractors to carry out jackhammering and jacketing, a process designed to strengthen and protect the structures.

According to Balogun, the contractor handling the work was already at the site and was expected to commence the next phase of jacketing in the coming week.

He added that concrete had been poured into drilled holes during the construction process, accounting for the appearance of the piles.

One of the piles, he noted, had already undergone jacketing.

Balogun therefore dismissed claims that the bridge was being vandalised, describing the work observed at the site as part of the ongoing engineering process.

Also speaking, Musa Saidu, Director of Bridges and Design at the Federal Ministry of Works, said the inspection became necessary after videos and reports circulated online alleging that scavengers were removing reinforcement from the bridge.

Saidu said Umahi ordered the immediate inspection to establish the actual condition of the infrastructure.

He said the assessment confirmed that there was no evidence of vandalism at the bridge.

Saidu explained that the contractor had established the platform as part of preparations for the jacketing of the piles.

He also disclosed that the project was being executed by the Lagos State Government.

The ministry official, however, warned residents against using the space beneath the bridge for accommodation or other activities, noting that such practices could expose the infrastructure to damage and increase the risk of fire outbreaks.

Earlier, Moremi Ojudu, Senior Special Assistant to the President on Community Engagements, South-West, said her office had received complaints and videos alleging that scavengers were damaging bridges and other government infrastructure.

She said the information was forwarded for verification, leading to the minister’s directive for the inspection.

Ojudu said the exercise demonstrated the government’s willingness to respond to reports from communities and citizens and verify concerns raised about public infrastructure.

She appealed to Lagos residents to refrain from living under bridges, stressing that such structures were designed for transportation and not habitation.

She also urged residents to keep their surroundings clean and assist government authorities in protecting public infrastructure from damage.

The delegation included Olufemi Dare, Federal Controller of Works in Lagos, among other officials and stakeholders.

Tags: Alakija BridgeAlakija Interchange Bridgebridge construction NigeriaDave UmahiFederal Ministry of WorksLagos bridge vandalismLagos infrastructureLagos State Ministry of WorksLagos-Badagry corridorNigeria road infrastructure
Previous Post

Vandal Dies After 330kV Transmission Tower Collapses in Delta – TCN

Next Post

Sanwo-Olu orders international highway clearance

Next Post

Sanwo-Olu orders international highway clearance

85-year-old community leader shot dead in Benin

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

FRSC

Rep in auto crash; 19 people, Toyota land Cruiser Prado, buses involved

August 8, 2026

Why I revamped N70bn Taraku mill abandoned for 40 years – Alia

August 8, 2026

85-year-old community leader shot dead in Benin

August 8, 2026

Sanwo-Olu orders international highway clearance

August 8, 2026

FG Debunks Viral Claim of Vandalism at Alakija Interchange Bridge in Lagos

August 8, 2026

Vandal Dies After 330kV Transmission Tower Collapses in Delta – TCN

August 8, 2026

NNPC Clarifies Licensing Round Role, Says Oil Production Grew 6% Under Ojulari

August 8, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.