Wednesday, April 29, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

FG announces two-day total closure of Third Mainland Bridge

Femi Adewale by Femi Adewale
October 29, 2020
in Breaking News, News
0
Fashola: Third Mainland Bridge’ll be totally reopened this weekend

The Federal Government, on Thursday, announced a two-day total closure of the Third Mainland Bridge in Lagos State for a concrete work on some sections.
The Federal Controller of Works in the state, Mr Olukayode Popoola, said in Lagos that the closure would begin from midnight of October 30 and end at midnight of November 1.
“We are planning to cast two number expansion joints, and we shall close the Third Mainland Bridge from midnight of October 30 until midnight of November 1,’’ he said.
The controller said that there was the need to shut both bounds of the bridge – from Adeniji Adele to Adekunle –  in addition to the closed bound of the bridge, to complete the work.
According  to him,   the closure is to ensure that there is no vibration on the bridge during casting in-place of the newly-installed expansion joints.
“This is to allow for setting of the special concrete, which allows the concrete to achieve its required compressive strength,’’ Popoola said.
He said that the Federal Government decided to close the bridge on  a weekend to minimise the impact on vehicular traffic.
According to him, adequate traffic managers will be deployed to control all the alternative routes.
“We regret any inconveniences this two-day closure will cause,’’ Popoola said.
The Third Mainland Bridge  is going through series of repair.
It was partially shut on July 24 for the repair.
The repair is expected to last for six months. It is divided into two phases of three months on each carriageway, starting with the Oworonsoki bound carriageway.
The first total closure of a section of the bridge from  Adekunle to Adeniji Adele was done from October 9 to 11 midnight, to complete the first stage of casting works.
The 11.8km bridge is the longest of the three bridges connecting Lagos Island to the Mainland.
The bridge starts from Oworonshoki, which is linked to the Apapa-Oshodi Expressway and the Lagos-Ibadan Expressway, and ends at the Adeniji Adele Interchange on Lagos Island.
Constructed in 1990, the bridge was adjudged as the longest in Africa until 1996 when the October 6 Bridge in Cairo was completed.

Tags: FG announces two-day total closure of Third Mainland Bridge
Previous Post

CBN releases framework for N75bn Youth Investment Fund

Next Post

Fire razes 18 rooms, eight toilets in Kano Nursing School

Next Post
Seven suspected smugglers die in petrol tanker fire

Fire razes 18 rooms, eight toilets in Kano Nursing School

How to improve Nigeria's security, by IGP

Police personnel in Oyo decry non-payment of Ondo election allowances

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

Court Closes Defence in Mompha’s N6bn Money Laundering Trial

April 28, 2026

Court Fixes May 8 to Hear Suit Challenging Jonathan’s 2027 Eligibility

April 28, 2026

Lagos Solar Policy Sparks Mixed Reactions Among Residents

April 28, 2026
Naira

NLC: ₦1m monthly salary worthless without stable Naira

April 28, 2026

IPAC Warns Rising Nomination Fees Threaten Nigeria’s Democracy

April 28, 2026

World Bank: Middle East war to spark biggest energy price surge in four years

April 28, 2026

ADC Crisis: Mark Faction Urges CJN to Speed Up Supreme Court Judgment

April 28, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.