Tuesday, October 6, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

Zungeru hydropower project to generate 2.64bn kWh electricity annually – Chinese consortium

Gbemi Banks by Gbemi Banks
October 9, 2023
in Electricity, News
0
Share on FacebookShare on TwitterShare on Whatsapp

The Zungeru hydropower project will generate 2.64 billion kWh of electricity annually.

A Chinese consortium comprising China National Electric Engineering Company (CNEEC) and Sinohydro, made this known in a statement in Abuja.

The consortium said that the project will make a significant contributions to Nigeria’s power generation capacity.

The Zungeru hydropower project, the consortium said is proof of the China-Nigeria partnership at its best.
”The project will provide flood-control, irrigation, water-supply and fish-breeding facilities; although construction works on the power plant started in May 2013, it was expected to take 60-months for completion with initial completion date of 2018.
“However, legal and financial challenges related to ecological settlement in the affected area delayed the project commissioning to 2021.
“The global pandemic COVID-19 further delayed the construction period as the site was shut down from operation in the year 2020 during the peak of the pandemic.”
The engineering, procurement and construction contract was awarded to  the China National Electric Engineering Company (CNEEC) and Sinohydro.
It said amidst security challenges such as attacks on workers at the site in 2022, the project progressed, adding that as of Aug. 15, 2023, the project was successfully handed over to the Federal Government.
The project located on the Kaduna River in Niger is a 700MW hydroelectric facility built by the consortium.
The project which costs about 1.3billion dollars approximately (₦162.9 billion) is the biggest power project completed in Nigeria in the past ten years and one of the biggest power projects in Africa.
The is designed to generate 2,630 GWh energy with a total installed capacity of 700MW.

Zungeru is one of several hydro projects that are part of Nigeria’s Renewable Energy Master Plan (REMP) proposed in 2006.

REMP seeks to increase the supply of renewable electricity – including wind, solar, biomass and small hydro – from 13 per cent of total electricity generation in 2015 to 23 per cent in 2025 and 36 per cent by 2030, according to the Nigerian government.

The government said additional hydro power plant (HPP) projects in various stages of development include 3,050-MW HPP, 360-MW Gurara II HPP, 38-MW Dadinkowa HPP, 40-MW Itisi HPP and 3,100-MW Mambilla HPP.

Nigeria’s population is more than 160 million people and published reports indicate the country’s 10 national integrated power projects only generate 4,000 MW of electricity.

Tags: CNEECZungeru hydropower
Share25Tweet16Send
Previous Post

Kanu shine in Gombe as Eyimba slump 0-2 in NPFL match

Next Post

MURIC sends SOS to President Tinubu on Lagos-Abeokuta Expressway

Next Post

MURIC sends SOS to President Tinubu on Lagos-Abeokuta Expressway

Kwara Utd find their rhythm, pip Abia Warriors 1-0

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

Court Orders NDLEA Chairman to Provide Duty Roster in Abba Kyari Drug Trial

October 5, 2026

SSANU Gives FG 14 Days to Pay Salary Arrears, Threatens Indefinite Strike

October 5, 2026

Court Reserves Judgment in Suit Challenging Mark, Aregbesola’s ADC Leadership

October 5, 2026

Teachers’ Day: ASUSS Demands Special Salary Structure for Nigerian Teachers

October 5, 2026
Tinubu and Dele Alake

70th birthday: The Dele Alake I know – Tinubu

October 5, 2026

UN-Habitat says 3.4 billion people lack safe and adequate housing worldwide, with more than one billion living in informal settlements and slums.

October 5, 2026

Keyamo: Removal of fuel, foreign exchange subsidies has enhanced capacity to fund critical aviation infrastructure

October 5, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.