Tuesday, April 28, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

Why road construction stopped during lockdown, by Fashola

Freedom Reporter by Freedom Reporter
May 30, 2020
in Breaking News, News
0
FG approves local production of bitumen, Fashola says 'I see demand of 500,000 metric tonnes locally per annum'

Fashola

Minister of Works and Housing, Babatunde Fashola (SAN), has explained why road construction was suspended during the lockdown imposed to curb the spread of COVID-19 across the country.
Speaking with Funmi Iyanda on a Public Live interview on Friday, Fashola said the lockdown made production and transportation of materials needed for construction impossible.
“Most of the materials used to construct the road like rocks and laterites in Lagos for example come from Ogun State. So, if there is a lockdown at the boundaries, how do you move them?
“This is apart from the process of mining and blasting rocks in an environment that requires people to work and lift things together while complying with current rules and guidelines of social distancing.
“These were why work stopped,” the former governor of Lagos said.
With the government implementing a gradual and phased easing of lockdown, Fashola said the Federal Government and state governments have approved that 11 contractors who are executing 53 projects, across 26 states should start work.
“They are all remobilising back to site, but we are doing it under very stringent guidelines about how they would work and feed at the site because they cannot share utensils anymore.
“This a logistic challenge that nobody has a rulebook for, nobody prepared for this, so, we are adapting and moving as we go on.”
Before the lockdown, Fashola said his ministry had inspected all federal road projects across the country.
“We have over 600 road projects nationwide. There is no state in Nigeria where we are not executing a road project,” the minister added.
Recognising inadequate accommodation as a prevalent across the world, said the President Muhammadu Buhari administration is committed to providing affordable housing for Nigerians.
Also speaking with Ms. Iyanda, chairman of the Federal Government advisory committee on the impact of coronavirus on the creative industry, Ali Baba, said it “a fact-finding committee.”
He urged the public to not assume it is a palliative distribution committee for the creative sector.
“Maybe there will be a committee set up to hand out palliatives, but we are just a data collection committee,” he said.

Tags: Why road construction stopped during lockdown by Fashola
Previous Post

Europe to Trump: Reconsider decision to withdraw from WHO

Next Post

Buhari greets Tola Adeniyi at 75

Next Post
Adeniyi

Buhari greets Tola Adeniyi at 75

Meditation-The true living, by Aare Kola Oyefeso

In quest for the true religion (Periscoping Islam), by Aare Kola Oyefeso

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

Hamzat and Sanwo-Olu

Lagos Govt: Sanwo-Olu not asked to resign

April 28, 2026

11 shot dead in Katsina

April 27, 2026

APC revises 2027 election timetable, releases payment accounts

April 28, 2026
Glo

Glo’s new TV commercials focus on power of seamless connection, infinite possibilities

April 27, 2026

UNILAG Student Testifies in Court Against Lecturer in Assault Case

April 27, 2026

Emefiele Seeks to Stop Prosecution in $6.3bn Fraud Case

April 27, 2026
Hamzat and Sanwo-Olu

Lagos guber: Sanwo-Olu endorses Hamzat as preferred successor

April 27, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.