Saturday, February 28, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

Umahi: Proposed 470 kilometres Abuja-Lagos superhighway will be completed in four years, to last 100 years; Kenny Martins is Consortium Chairman

Freedom Reporter by Freedom Reporter
September 24, 2023
in Breaking News, Construction, News
0
Umahi: Proposed 470 kilometres Abuja-Lagos  superhighway will be completed in four years,  to last 100 years; Kenny Martins is Consortium Chairman

L-R: Arc Lateef Bakare, Director, AEC Unity Network Ltd Consortium; Chief Kenny Martins, Chairman, AEC Network Limited Consortium and Dr Dave Umahi, Minister of Works, during conference.

1.7k
VIEWS
Share on FacebookShare on TwitterShare on Whatsapp

The proposed 470 kilometres Abuja-Lagos Greenfield superhighway will be completed in four years and last 100 years, the Federal Government said on Saturday.

Minister of Works, David Umahi, told journalists in Lagos that the road will be built by a private sector consortium at no cost to the government.

The consortium will operate the facility for a yet-to-be-determined period on a build, operate and transfer deal, he said, adding that it will be tolled at different points to enable the investors recoup their investment.

He assured that the four-and-a-half-hour travel time for vehicles plying the route at 100 kilometres per hour was achievable.

“When I first introduced this to the public, many doubting Thomases were saying ‘it is impossible, Lagos-Abuja that is done in 14 hours cannot be done in four and half hours’, that is the renewed hope of Mr President,” he said.

The Minister explained that President Bola Tinubu approved that the project be speeded up, adding that the contractor should be on site in three months.

Umahi said: “The president has approved that I fast-track this project. This project is going to be two lanes, but each lane is going to be a two-carriage way and it is going to be 14 metres.

“The only carriageway that is equivalent to this is the Third Mainland Bridge where each carriageway is 14 metres. It is going to be built on 275-millimetre thick concrete.

“The live-shelf design of this project is going to be 100 years. It is going to be completed within four years and this is doable. There are a number of bridges that will be built. There are a number of tolling points that are going to be there.

“We are not putting any kobo but we will assist them in every direction.”

He explained that from Lagos, the road will pass through eight states in the Southwest and Northcentral before it gets to Abuja.

L-R: Arc Lateef Bakare, Director, AEC Unity Network Ltd Consortium; Chief Kenny Martins, Chairman, AEC Network Limited Consortium and Dr Dave Umahi, Minister of Works, during conference.

The states are Kogi, Ekiti, Oyo, FCT, Lagos, Ogun, Niger and Kwara.

He praised the private consortium behind the deal, Advance Engineering Company, saying he was “very satisfied with their concept and what they have put in place.”

Umahi added: “So, the next thing is to bring the business proposal so we can negotiate on what the cost of the project is going to be. Then they go to the Ministry of Finance and negotiate on the issue of their money.

“The good thing is that we are building this road on concrete so we can predict the cost. In asphalt, you cannot predict the cost. The cost of asphalt roads changes every month.

“Concrete roads are more durable and cheaper than asphalt and I have directed all ongoing projects that have not advanced up to 80 per cent to change the remaining to concrete.”

The Minister added that plans were underway to make the road a business and industrial corridor with hotels, factories and housing estates, among others, on the route.

Emphasising the seriousness of the project, Umahi said the contract would be watertight such that if the consortium backed out unreasonably, it may have to pay a fine of $10 million.

Chairman of the consortium, Kenny Martins, described the project as “the first of its kind in Africa”, saying it would be ICT-compliant with a fibre optic connection, solar-powered street lights and security points on the entire stretch of the road.

Martins said in Lagos, the route would begin from the proposed 4th Mainland Bridge in Epe to Abuja.

Tags: Umahi: Proposed 470 kilometres Abuja-Lagos superhighway will be completed in four years to last 100 years; Kenny Martins is Consortium Chairman
Share26Tweet17Send
Previous Post

ALARHOSPS rolls out events for 10th anniversary, to unveil Assembly Hall in Epe school

Next Post

Stakeholders appeal for justice in Ogoniland

Related Posts

LASU Alumni Association congratulates Tunji Disu on appointment as Acting IGP
News

LASU Alumni Association congratulates Tunji Disu on appointment as Acting IGP

February 28, 2026
Kogi Assembly: BUA Group acquired over  50,000-hectare land 10 years ago, yet to pay for it
Breaking News

BUA Cement profit rises to N356bn

February 28, 2026
Anambra fire fighters’ quick intervention stalls depot fire
Breaking News

Fire razes Emir’s palace

February 28, 2026
Next Post
Stakeholders appeal for justice in Ogoniland

Stakeholders appeal for justice in Ogoniland

Cross River gorillas will boost local tourism if protected, says Wild Africa Fund

Cross River gorillas will boost local tourism if protected, says Wild Africa Fund

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

  • Ogun guber: Iyabo Obasanjo attacks Adeola Yayi, says ‘you are an opportunist, your political migration driven purely by ambition rather than service’

    Ogun guber: Iyabo Obasanjo attacks Adeola Yayi, says ‘you are an opportunist, your political migration driven purely by ambition rather than service’

    78 shares
    Share 31 Tweet 20
  • Finance Minister fired

    68 shares
    Share 27 Tweet 17
  • Trump considers regime change, limited strike on Iran to press nuclear deal

    67 shares
    Share 27 Tweet 17
  • NDLEA arrests Trans Fortress Global Resources CEO for alleged illicit drug business

    66 shares
    Share 26 Tweet 17
  • Police chief dies in auto crash

    67 shares
    Share 27 Tweet 17
  • INEC moves 2027 presidential election to January 16, guber February 6

    66 shares
    Share 26 Tweet 17

Latest Stories

LASU Alumni Association congratulates Tunji Disu on appointment as Acting IGP

LASU Alumni Association congratulates Tunji Disu on appointment as Acting IGP

February 28, 2026
Kogi Assembly: BUA Group acquired over  50,000-hectare land 10 years ago, yet to pay for it

BUA Cement profit rises to N356bn

February 28, 2026
Anambra fire fighters’ quick intervention stalls depot fire

Fire razes Emir’s palace

February 28, 2026
Odigie-Oyegun expresses concern over security in Edo, as Amaechi declares presidential ambition

Israel launches ‘preemptive’ strike on Iran

February 28, 2026
Tinubu welcomes Lebara’s launch in Nigeria

Tinubu welcomes Lebara’s launch in Nigeria

February 28, 2026
Odigie-Oyegun: Edo people will decide their governor, not outsiders, primitive loyalties must be set aside

Odigie-Oyegun expresses concern over security in Edo, as Amaechi declares presidential ambition

February 28, 2026
Video: Lagos Deputy Governor addresses protesters

Lagos Govt speaks on ‘₦4.2bn to purchase furniture, microphones for Deputy Governor’

February 28, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.