Friday, May 1, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

Umahi clarifies on completion time for Lagos-Calabar Coastal Highway  

Robert Imoh by Robert Imoh
May 2, 2025
in News
0

 The Minister of Works, Sen. Dave Umahi, has clarified on the Lagos-Calabar Coastal Highway project implementation, saying that it is the Section One of the project that is 70 per cent completed.

Umahi made the clarification in an interview with newsmen during a tour of some bridges on the Lagos-Ibadan Expressway, on Thursday.

“Some of you reported that I said the Lagos-Calabar Coastal Highway was 70 per cent done and will be finished by January 2026.

“That is not what I said. We were dealing with section one, and then, we said, as at today, that section one, which is 47.47km, has been 70 per cent completed,” he said.

The minister said that the entire Section One of the Lagos-Calabar Coastal Highway would be completed by January 2026.

Umahi said that the coastal highway would be tolled.

On the Lagos-Ibadan Expressway, which he also inspected, Umahi said: “We checked five bridges, and we discovered that we have a problem in as much as the standard headroom in bridge design is 5.6 metres.”

He noted that some of the bridges were up to 6.2 metres while some were 5.6 metres.

“ The least we had was one that was 5.4 metres.”

He regretted that some of the beams were being hit by vehicles, posing dangers.

“Of the five bridges we inspected, our directive is that we are going to descend the carriageway.

“ We are going to dig up to one metre and then reconstruct the carriageway,” he said.

Umahi said that the aim was to create headroom that would be up to 6.5 metres.

He directed that the minimum requirement henceforth would be 6.5 metres to achieve the desired results.

The minister said he had directed that the Alapako Bridge in Ogun should be closed.

“The way it is now is very dangerous because a lot of the beams are compromised by vehicles.

Previous Post

FG directs stop to work on Sagamu-Iperu Road over poor quality

Next Post

Akpabio: U.S.-based Nigerian, Sandra Duru, reveals shocking details of ‘Natasha Akpoti-Uduaghan’s many lies’

Next Post
Sandra Duru

Akpabio: U.S.-based Nigerian, Sandra Duru, reveals shocking details of 'Natasha Akpoti-Uduaghan's many lies'

Funke Treasure clinches Triple Honours at 2024 Accenture Gender Mainstreaming Awards

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

Senate

₦210trn claim fails ‘Market-Woman Test’, FACT tells Senate

May 1, 2026
How our ex-student was shot dead, by LASU

LASU spends N200m monthly on power

May 1, 2026
Again court sentences Samsung heir to two and a half years imprisonment

Samsung posts record Q1 revenue, flags market pressures

May 1, 2026
Fubara

2027: Rivers APC stakeholders purchase guber forms for Fubara

May 1, 2026

Workers demand equal retirement policies of 65 years, 35 years in service

May 1, 2026

Yusuf Buhari gets automatic APC ticket to seek Reps seat

May 1, 2026
Tinubu plane

Tinubu to embark on a three-nation trip

May 1, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.