Sunday, April 19, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

Third Mainland Bridge repairs completed

Freedom Reporter by Freedom Reporter
October 22, 2023
in Breaking News, Construction, News
0
Third Mainland Bridge

Third Mainland Bridge

The Federal Controller of Works in Lagos, Mrs Olukorede Kesha, on Sunday, expressed satisfaction with repairs done on the Third Mainland Bridge, assuring motorists of smooth ride till the commencement of comprehensive rehabilitation in January 2024.

Kesha gave the assurance on Sunday during an on-the-spot assessment of the repairs on the bridge.

The controller had, on Thursday, announced a 24-hour closure of the bridge to allow for repairs of some critical portions.

The closure took effect from midnight of Saturday till midnight of Sunday (today) to reduce the hardship being faced by motorists.

During the inspection, the controller stopped on various portions between Iyana-Oworo and Adeniji-Adele where remedial repairs had been done on a 9.7-kilometre stretch of the Lagos Island in-bound lane.

She stated that the construction done was just palliative works to keep the highway in good condition pending the comprehensive rehabilitation scheduled for January 2024.

“This repair is going to last beyond January; we don’t intend to do any work that will last only one or two months. Even by January, the road will still be good,” she said.

Kesha said that some of the components needed for the comprehensive rehabilitation works were being imported for the emergency repairs to begin.

She added that what the Federal Ministry of Works had been doing before now was attending to failed portions, adding that the comprehensive rehabilitation would involve total removal and replacement of the asphalt surface.

Third Mainland Bridge

The controller added that damaged ramps and expansion joints would be replaced, in addition to the painting of the parapet walls and other major repairs.

According to her, the contract awarded for comprehensive rehabilitation of the bridge in January would last for six months, but would be divided into two segments of three months for each phase.

Kesha explained that the comprehensive repairs would give the infrastructure a new lease of life, after which the bridge would wear a new look.

She urged road users to continue to enjoy smooth ride on the highway, adding, however, that they should observe traffic and safety rules on the highway.

Meanwhile, some road users thanked President Bola Tinubu for the repairs, but called for more routine maintenance and increased funding for the bridge and other roads in Lagos.

Mr Adewale Edward, a commercial bus driver who plies Ikeja-CMS/Obalende route, commended the repairs done at the weekend which, he noted, was an off-peak period.

He, however, called for more regular maintenance and proactive measures to make the bridge pothole-free at all times.

A trader in Oke Koto, Agege area, Mrs Sadia Saleh, also praised the president for introducing short term repairs that would not impact activities and businesses negatively.

“Tinubu knows how to grow economy; that’s why he did the repairs after we had finished business on the Island on Saturday, and because people are plenty in Lagos, doing repairs on weekend is better.

“I like the one-day repair; government should be doing it like that at weekends and also at night. May God help our president,” she said.

Other road users also commended Tinubu and appealed for increased funding for federal road projects in the state.

The 11.8-kilometre bridge is the longest of the three bridges connecting Lagos Island to the mainland.

The bridge, which starts from Oworonshoki, linking Apapa-Oshodi expressway and Lagos-Ibadan expressway, ends at the Adeniji-Adele interchange on Lagos Island.

It was constructed in 1990 and adjudged as the longest bridge in Africa until 1996 when the construction of October 6 Bridge in Cairo, Egypt, was completed.

Tags: Third Mainland Bridge repairs completed
Previous Post

Kogi guber: Women group endorses APC candidate, Ododo  

Next Post

Solid Minerals transformation: Alake promises to work with PwC

Next Post

Solid Minerals transformation: Alake promises to work with PwC

'Regular blood donation reduces risk of heart attack'

10 die of heart attacks during festival

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

SERAP Urges Tinubu to Reverse NBC Directive on Broadcasters

April 19, 2026

Lagos Govt unveils Comprehensive Cybersecurity Guidelines to strengthen Digital Safety

April 19, 2026
Taiwo Oyedele

Oyedele clears air on ‘false allegation of hidden spending, diversion of federation revenue’

April 19, 2026
Dakuku Peterside, former Director-General of NIMASA (left), welcoming Chief Don Etiebet and his wife, Dr.  Nike Etiebet, to the Independent Awards 2025, Silver Jubilee Edition, at Eko Hotel and Suites, Lagos...on Saturday.

Independent Newspapers celebrates Game Changers, Barrier Breakers at Silver Jubilee Anniversary

April 19, 2026

Oyedepo: Within seven days, divine retribution will strike those behind killings, kidnappings in Nigeria

April 19, 2026

Why some Youth Corps members have not been mobilised, by NYSC DG

April 19, 2026
JAMB

UTME: JAMB releases results for second, third days of examination

April 19, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.