Shell Petroleum Development Company Joint Venture (SPDC JV), on Friday, lifted the force majeure on gas supplies to NLNG from the Eastern Gas Gathering System (EGGS-1) following repair of a sabotage leak on the line.
The force majeure was declared on August 4, 2015.
The Joint Investigation Team, which visited the site, found that the leak was caused by a crude theft connection, apparently installed by people who thought the line was transporting crude oil.

















