Tuesday, June 2, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

‘Second Niger Bridge ready in June’

Chidi Roberts by Chidi Roberts
December 24, 2021
in Breaking News, News
0

The second Niger Bridge may be completed by the second quarter of 2022, according to Mr Adeyemo Ajani, Federal Controller of Works in Anambra State.

He said in Awka on Friday that the contractor handling the project is on site and has been working uninterrupted after a cumulative one-year delay as a result of COVID-19 lockdown and issues with contract affected communities.

He, however, said these issues have been sorted out and that hopefully, the job would be delivered in the second quarter of 2022.

He said the contracts for the connecting roads have been awarded but the contractors have not been mobilised. 

“Job is still on course, the Federal Government has never relented and the contractor is working hard to deliver the project by the second quarter of next year,” he said.

On the Enugu-Onitsha expressway, Ajani said work has been completed on the Enugu bound lane from Umunya to Awka and that work would commence on the Enugu bound lane in January.

He said though traffic had moved to the rebuilt lane of the road, motoring was much easier than it was in the past.

The Federal Controller, however, decried the effect of multiple checkpoints on the Onitsha-Owerri expressway on free flow of traffic.

He said the Police should vacate the highway to enable motorists move without hassles and come up with more modern approaches to checking crime.

Ajani, who regretted the stretch of gridlock on the roads, said the aim of fixing the roads is to ensure that people traveled without difficulty, especially during the Christmas and New Year periods.

According to him, the Onitsha-Owerri road is in good shape apart from where contractors are working around Idemili bridge, but there is a police checkpoint there that is a challenge to traffic.

“They don’t seem to understand the importance of free flow of traffic, the road blocks mounted on that road constitute nuisance, sometimes the traffic stretch from Oba to that bridge.

“They should relax these checkpoints and allow free flow of traffic around the state, especially during this Yuletide period,” he said.

Tags: 'Second Niger Bridge ready in June'
Previous Post

Collapse of 330KV Line causes pipeline explosion in Lagos

Next Post

Baba Akande, My Participations & The Backlash, by Tunde Rahman

Next Post

Baba Akande, My Participations & The Backlash, by Tunde Rahman

Peter Obi at 60: A Retrospect, by Valentine Obienyem

Peter Obi urges Christians to show more love, give their best for societal development at Christmas, always

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

Alt="Former Nigerian President Olusegun Obasanjo"

Obasanjo: I have been managing ‘disease with no cure’ for over 40 years

June 1, 2026
NSCDC

NSCDC dismisses report on N2bn traced to its officer’s account (see statement of account)

June 1, 2026

ADC Primary: Hayatu-Deen Rejects Legal Challenge, Calls for Strong Opposition Unity

June 1, 2026
Alt="President Bola TINUBU"

NHF Urges Tinubu Administration to Strengthen Tobacco Control Measures

June 1, 2026

Nigerian Scholar Earns 10 Academic Honours at U.S. University for Health Communication Research

June 1, 2026

Abeokuta Residents Demand Release of Abducted Oyo Schoolchildren

June 1, 2026

CBN Launches Payments System Vision 2028 to Drive Digital Economy Growth

June 1, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.