Tuesday, November 17, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

Second Niger Bridge ready for use by Christmas, says FG

Chidi Roberts by Chidi Roberts
October 3, 2022
in Breaking News, News
0
Share on FacebookShare on TwitterShare on Whatsapp

The Federal Government has said that the Second Niger Bridge will be ready for use by Christmas this year.

Ag Controller of Works in Anambra, Mr Seyi Martins, said this in Awka on Monday.

Martins said that the first phase of the Second Niger Bridge measuring 1.6km, had reached 95 per cent completion.

The Controller said, contrary to the news making the round that the project would be ready by 2024, the projects would be ready for use for travellers during the yuletide.

According to him, President Muhammadu Buhari administration is determined to ensure that travellers enjoyed stress free motoring over the River Niger

He said motorists would not be subjected to gridlock experienced on the existing bridge during yuletide this year.

“The first phase of the project, which was the bridge itself, is substantially completed.

“The bridge project is 95 per cent complete and it is expected to be ready by December 2022.

“The steel guard rails are complete, the roads are set for vehicle traffic; the toll plaza area is almost completed, and what is left is the installation of toll booth canopies,” he said.

The Controller said the bridge could be accessed from the interchange at Obosi on the Onitsha-Owerri road and that a road was being constructed to connect traffic on the Asaba-Benin expressway to it pending the completion of the second phase.

“The second phase of the project is yet to commence, but the government has deemed it fit that upon completion of the first phase it will be open to traffic.

“At the Onitsha end, there is an interchange at Obosi along the Onitsha – Owerri highway where you can access the bridge.

“On the Asaba end, there is a link road we are constructing to enable travelers to access the bridge from Benin-Onitsha road,” he said. 

Tags: Second Niger Bridge ready for use by Christmas says FG
Share25Tweet16Send
Previous Post

Transportation Minister applauds NIMASA’s capacity development initiatives

Next Post

UNILAG@60: Pro Chancellor urges more contributions to $500m endowment scheme

Next Post

UNILAG@60: Pro Chancellor urges more contributions to $500m endowment scheme

Solicitor General, Enitan, Adegboruwa, Rhodes-Vivour, 34 others make SAN list

Adegboruwa: No SAN should merit the Rank if he has any counsel in his firm earning less than N150,000 monthly

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

Court Told How Accused Allegedly Forged Document To Apply For Court Bail

November 16, 2026

Over 11,000 hectares occupied by UNIABUJA exceed the 100 hectares recommended by NUC – Wike’s aide

November 16, 2026
Makinde

Public motor parks: Oyo Govt, NURTW crisis deepens

November 16, 2026

All 36 states approve state police constitution alteration bill – NASS Clerk

November 16, 2026

Again, court strikes out Citadel MD, Benjamin Joseph’s suit against Zinox, affirms Tech Giant’s innocence in long-running dispute

November 16, 2026

South Africa Mass Shootings: 17 Killed in Separate Attacks in Pretoria and KwaZulu-Natal

November 16, 2026

INEC Disowns Man in Viral Video Alleging Partisan Recruitment in Edo

November 16, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.