Thursday, April 23, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

Second Niger Bridge 78% completed, says FG

Femi Adewale by Femi Adewale
December 30, 2021
in Breaking News, News
0

The Federal Government says the Second Niger Bridge under construction is currently at 78 per cent completion and is expected to be delivered by November, 2022.

Minister of Information and Culture, Alhaji Lai Mohammed, disclosed this on Thursday in Lagos at a media briefing.

He said the ongoing work on the bridge consisted of the construction of a 1.59kilometre bridge and 10.3kilometre approach roads.

“The total length of the Main Work is 11.90km while the bridge and approach roads are 2×3 lane expressways.

“Other ancillary works include the construction of two secondary bridges at Oko Amakun (21.70m) and Atani Road (21.70m).

“Also to be constructed is a new cloverleaf interchange at Onitsha-Owerri Road while several culverts and drainage structures will also be constructed,’’ he said

Mohammed said various highways and bridge projects at various stages of completion were ongoing across the six-geopolitical zones of the country.

He said the 360-meter bridge at Ikom in Cross River State and 400-meter border bridge between Nigeria and Cameroon at Mfum and Ekok, were respectively completed in 2021 and awaiting commissioning.

Mohammed said the Buhari administration distinguished itself in the provision of key infrastructure important to the growth and development of the economy.

The minister listed some of the projects carried out in 2021 by the Federal Ministry of Works and Housing to include the Nnewi-Uduma Road, Sections I and II (26.27km) in Enugu and Ebonyi States.

Also in the list were the Kano-Maiduguri Road Section II (100.08KM), (Shuwarin-Azare) in Jigawa and Bauchi States and Kano-Maiduguri Road Section III (Azare-Potiskum) 106.34km in Bauchi and Yobe States.

Others were the Vandeikya-Obudu Cattle Ranch Road Phase I and II (24km) in Benue and Cross River States and Sokoto-Tambuwal-Jega-Kontagora-Makera Road (304km).

The minister said government created Highway Development and Management Initiative (HDMI) to ensure private sector participation management and development of federal road network,

According to the minister, out of the total length of the federal road network of about 35,000km, the first phase of the proposed HDMI would cover a total length of about 1,963.24km.

“Most of the ongoing projects of the ministry, especially the Highways Development and Management Initiative (HDMI), are already attracting massive infrastructural investment.

“It is envisaged that over a trillion-naira direct investment will be mobilised in the first phase of the HDMI,’’ he said.

Mohammed noted that the policies, programmes and projects of government in the sector had contributed to stabilising the macro-economic situation of the country, particularly in job creation.

Tags: Second Niger Bridge 78% completed says FG
Previous Post

Femi Adesina: With City of David, Umahi ends 2021 on a high

Next Post

Burna Boy electrifies FirstBank DecemberIssaVybe Campaign with sterling performance

Next Post
Burna Boy

Burna Boy electrifies FirstBank DecemberIssaVybe Campaign with sterling performance

Oyetola's re-election is 'God's project', says Senate spokesman

Ada-Igbajo Road: I've fulfilled another campaign promise, says Oyetola

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

FAAC

March revenue: FG N789.159bn, states N657.596bn, councils N468.826bn

April 22, 2026

Alleged coup: Court remands suspects in DSS custody, orders accelerated hearing

April 22, 2026

Ambassador-designate is dead

April 22, 2026

Presidency: Wale Edun, Musa Dangiwa ‘resigned, not sacked’

April 22, 2026
NNPCL

NNPC Ltd and the Future of Nigeria, by Dan D Kunle

April 22, 2026

Segun Odegbami: NFF officials do not deserve another term, they should go

April 22, 2026
ADC

ADC to FG: You have lost control of the fight against terror

April 22, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.