Sunday, April 26, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

Sanwo-Olu vows to complete Red, Blue Train Line projects, orders engagement of UNILAG, LASU, YABATECH Engineering students

Femi Adewale by Femi Adewale
September 25, 2021
in Breaking News, News
0

The 2022 deadline set for the completion of the Lagos Rail Mass Transit (LRMT) projects being undertaken by the Lagos State Government remains sacrosanct, Governor Babajide Sanwo-Olu promised on Saturday.

The Governor defied the rain for a physical assessment of the progress made in the construction of both Blue and Red Lines, inspecting the rail corridors to evaluate the ongoing work.

Sanwo-Olu vows to complete Red, Blue Train Line projects, orders engagement of UNILAG, LASU, YABATECH Engineering students

The inspection came five months after Sanwo-Olu performed the groundbreaking ceremony to kick off the construction of the 37-kilometer-long Red Line, which starts from Agbado and terminates at Oyingbo.

The Blue Line project, which started in 2010, is currently at over 80 per cent completion.

Sanwo-Olu vows to complete Red, Blue Train Line projects, orders engagement of UNILAG, LASU, YABATECH Engineering students
The rail projects are being undertaken by the Lagos Metropolitan Area Transport Authority (LAMATA), an agency under the Ministry of Transportation.

The Deputy Governor, Dr. Obafemi Hamzat, Commissioner for Transportation, Dr. Frederic Oladehinde, and other members of the State’s cabinet joined the Governor in the inspection that started at the Ikeja Terminal of the Red Line project.

Sanwo-Olu, visibly elated by the progress of work, said the take-off of the Red Line project represented a major breakthrough for his administration in its drive to deliver an integrated transportation model that would ease road congestion in the State.
Sanwo-Olu vows to complete Red, Blue Train Line projects, orders engagement of UNILAG, LASU, YABATECH Engineering students

He said: “We are excited about the ongoing rail projects being undertaken by the Lagos State Government and there is a huge number of jobs being provided to Nigerians engaged by the contractor at all stages of the construction work. There are over a thousand personnel working at the Marina Terminal alone. We are happy with the extent of work on both projects. What we have seen at the Ikeja Station, which is the second biggest station after the one being built at Marina, gives us so much hope that the projects are on course.

“Based on the physical assessment, we are believing that the timelines set for the completion of major engineering work are on track. We are also believing that our contractor is working on schedule. Although there are few hiccups, we believe we will be able to address and surmount them. By the last quarter of 2022, we hope that trains would move on both corridors. And by 2023, we expect to see the full operation of both Blue and Red Lines.”

Henceforth, Sanwo-Olu said there would be quarterly assessment and monitoring of the two projects. By doing this, he said the State Government would avoid the pitfalls that stalled the progress of the Blue Line prior to his administration.

There are six overpasses being constructed at strategic level crossing points along the Red Line corridor to eliminate interactions between the rail tracks, vehicular and pedestrian traffic.

The Governor also stopped at Yaba Terminal of the Red Line, assessing the work done. He later moved to the Oyingbo Train Terminus, where construction was at the third level toward completion.

There will be a stabling extension from Oyingbo to Iddo, which would be used as a parking lot for the train.

The Marina Terminus of the Blue Line, which will be an elevated station, would be a transportation hub that would offer intermodal transportation services.

“At Marina Station, not only are we building rail tracks, underneath we will have a bus station as well for the BRT and First-and-Last Mile buses. There will also be a ferry service at the Marina Station for those who want to travel through the waterways,” Sanwo-Olu said.

Sanwo-Olu vows to complete Red, Blue Train Line projects, orders engagement of UNILAG, LASU, YABATECH Engineering students

The Governor hailed the Chinese contractor for the speed of the construction but said there was a need for knowledge and skill transfer in order to retain the engineering skills brought into the projects by the Chinese contractor.

Sanwo-Olu vows to complete Red, Blue Train Line projects, orders engagement of UNILAG, LASU, YABATECH Engineering students

Sanwo-Olu directed engagement of engineering students at the State-owned Lagos State University (LASU), University of Lagos (UNILAG) and Yaba College of Technology (YABATECH) through internship programme to enable them have practical knowledge of rail construction.

Tags: Sanwo-Olu vows to complete Red Blue Train Line projects orders engagement of UNILAG LASU YABATECH engineering students
Previous Post

Controversy over alleged invasion of suspended Enugu monarch’s residence

Next Post

Emefiele: Nigeria needs $100bn annually to address infrastructure deficit

Next Post
Implementation of cashless policy in public interest, says Emefiele

Emefiele: Nigeria needs $100bn annually to address infrastructure deficit

Usyk halts Joshua’s reign as world boxing heavyweight champion; devastated Joshua heads to hospital to check eye socket

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

UBA

UBA Plc delivers core income growth in Q1 2026

April 25, 2026

2027: Atiku, Makinde, Mark, Turaki, Obi, Kwankwaso, Aregbesola, Amaechi, others meet in Ibadan, vow to field one presidential candidate to challenge APC

April 25, 2026

Barcelona extend LaLiga lead with 2-0 win over Getafe

April 25, 2026

EPL: Scrappy Arsenal edge out Newcastle 1-0 to reclaim top spot

April 25, 2026
Haske

Yola agog as Abdulrahman Haske declares for Adamawa governorship race + pix

April 25, 2026

GRIT TO GLORY: OLADITI EMERGES AS NUPENG PRESIDENT IN A DEFINING MOMENT

April 25, 2026

Gunmen Kill Traditional Ruler, Wife, Two Others in Benue Community

April 25, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.