Monday, April 20, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

Sanwo-Olu: Agege-Pen Cinema Bridge opens February

Femi Adewale by Femi Adewale
December 9, 2020
in Breaking News, News
0

Barring any exigency, the long-awaited Agege Pen-Cinema Bridge in Lagos State will fully open to vehicular movement in about eight weeks, Governor Babajide Sanwo-Olu assured commuters in the axis.

The project is said to be at 90 per cent completion; all civil works have already been completed on the bridge.
Sanwo-Olu: Agege-Pen Cinema Bridge opens February
The overpass ascends from Oba Ogunji Road and drops at Oke Koto axis of Agege. The bridge also opens to the old Lagos-Abeokuta Expressway through Abule Egba.

When opened for use, it will bring an end to the discomfort currently being experienced by motorists plying Agege-Abule Egba.
Sanwo-Olu: Agege-Pen Cinema Bridge opens February
Sanwo-Olu, in company of his Deputy, Dr. Obafemi Hamzat, and members of the State’s cabinet, went on an unplanned inspection of the project site on Wednesday and assessed the level of work done so far.

The Governor was joined in a walk-through on the 1.7 kilometre-long bridge by a multitude of ecstatic residents, who expressed their appreciation on pace of work on the bridge.

Speaking to reporters during the tour of the project site, Sanwo-Olu expressed satisfaction on the quality of work done, disclosing that the bridge would be fully opened for public use next February.
Sanwo-Olu: Agege-Pen Cinema Bridge opens February
He said the only work left on the bridge was turning intersection improvements at the descending part of the bridge and signalisation for ease of traffic movement.

The Governor said: “We have just finished an inspection and a walk through of the Agege Pen-Cinema Bridge. The level of completion of the project is around 90 per cent. All the major brick work has been done and we are left with two major deliverables, which include cleaning up the intersection and signalisation.

“There are four synchronised signalisation we are expecting to have and each must work together with the other. We are expecting that all these will be done early next year. This is in fulfillment of the promise we made that we will complete all projects abandoned. We are giving the contractor handling this project a maximum of eight weeks to attend to little snags in the project.
Sanwo-Olu: Agege-Pen Cinema Bridge opens February
“By second week in January, vehicles can move on the bridge but we may need additional four weeks to complete the signalisation, road painting and demarcation. We are looking forward to fully hand over this project sometimes in February next year.”

Sanwo-Olu said the State Government had started to consider other complementary road construction to be done on the axis to further improve traffic for commuters in the area.
Sanwo-Olu: Agege-Pen Cinema Bridge opens February
The Governor said the State was in talks with the Federal Road Maintainance Agency (FERMA) to take on adjoining arterial roads, with the objective to ease flow of traffic from the bridge down to other areas.
Sanwo-Olu: Agege-Pen Cinema Bridge opens February
Addressing a crowd of residents at the site, Sanwo-Olu urged them to be patient while the contractor puts final touches on the project.
He said his administration moved to complete the bridge given its strategic importance to easing gridlocks and improving economic activities in Agege and adjoining communities.

The Governor also charged the residents on the need to keep peace in the area, asking them to protect assets of the Government in their neighborhoods.

Sanwo-Olu: Agege-Pen Cinema Bridge opens February

Tags: Sanwo-Olu: Agege-Pen Cinema Bridge opens February
Previous Post

FEC approves N58.5bn for road projects in Kano, Kaduna, Plateau, FCT

Next Post

Palliatives: CA-COVID vindicates Osun Govt

Next Post
Ekiti Govt warns hoodlums, says 'no Covid-19 palliatives left in any warehouse'

Palliatives: CA-COVID vindicates Osun Govt

NASS to make Smart Card Reader compulsory in future elections

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

Amupitan

Forensic investigation reveals X Account attributed to INEC Chairman ‘fake, part of coordinated disinformation campaign’

April 20, 2026

Oyewumi greets Alli at 63

April 20, 2026

Tinubu approves new Police Academy Campus, N15bn take-off grant (see location)

April 20, 2026

Court Adjourns ADC Suit Against Senator Ireti Kingibe to June 9

April 20, 2026

Power Instability Slows Smart Manufacturing Growth in Nigeria – Expert

April 20, 2026

Iran Executes Two Men Over Alleged Espionage for Israel

April 20, 2026

Ex-Minister, UNN Seek Out-of-Court Settlement in Certificate Forgery Case

April 20, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.