Friday, May 1, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

Putting New Wine in Old Wineskin – The Oshodi Megabus Interchange Scheme (2), by Gbenga Onabanjo

Freedom Reporter by Freedom Reporter
February 24, 2022
in News, Opinion
0
The pedestrian-friendly environment, by Gbenga Onabanjo

Gbenga Onabanjo

Governance is a continuum, particularly democratic governance. No matter how short the time a project is conceived in relation to the end of the tenure of the administration that conceived it, the project should be allowed to run its full course without undue fast-tracking that may not produce the required outcomes. That is why the Scripture alludes to the fact that Paul may plant, Apollos may water, but it is God that gives the increase.

As previously stated, the current Oshodi is a work in progress. It is a meal that is not fully done yet. It is perceived as a local delicacy the government wishes to serve the cosmopolitan people of the state. For its endearment, more preparation has to be put in place, more ingredients are needed before it is served for people to savour the real flavour. Otherwise, the served menu ultimately may taste awful.

In our clime, we seem to make light of education, mobilisation, orientation, enlightenment and advocacies of the citizens before embarking on projects. Stakeholder engagement is very important for them to have buy-in and take ownership, once the project is running. The pre-contract engagement of stakeholders for this project seems not to have been adequate, hence the nonchalance, apathy and low patronage.

Since the infrastructure required to make this scheme perform optimally is not fully in place, the government needs to address this as a matter of urgency to be able to extract and maximise the full benefits of the project.

A phased approach may be the best way to go at this time to identify the needs and fix them one after the other. A comprehensive master plan that is all-encompassing should be generated to take care of the subject site and its environs, plugging in other infrastructure coming to the axis. This should be gazetted for successive governments to follow.

For improved services in its current state, it is imperative for the operators of the project to put in place the following:

• Clean up the entire surrounding of the complex and rid it of trailers, nuisance and abandoned vehicles.
• Pave completely all the roads that lead into and out of the complex and ban street trading around there.
• Make provision for park and ride for riders who wish to park their cars and hop on the bus.
• Put a maintenance schedule in place to continually clean and maintain the facilities.
• Ensure the vicinity is secure 24/7 by deploying security operatives in and around the complex to deter miscreants or loiters from hanging around the complex.
• Incorporate and reinstate the recreational park which had become the hallmark of the site.
• Advertise for competitive bidding for bus operators on the various routes and find a way to integrate the BRT scheme into it.
• Let the project be seen as belonging to the state, and every decision taken to be in the interest of the state and not individuals.

*Onabanjo is a Lagos-based architect, environmentalist, public commentator and the chief responsibility officer at Go-Forte Foundation.

Tags: Putting New Wine in Old Wineskin – The Oshodi Megabus Interchange Scheme (2) by Gbenga Onabanjo
Previous Post

Last Man Standing, biopic of Tinubu, not a propaganda, says Oloketuyi

Next Post

Police Constables to Inspectors to get new uniforms quarterly

Next Post
Anambra guber: IGP meets Commanders of Police Mobile Force Squadrons

Police Constables to Inspectors to get new uniforms quarterly

Ukraine: Fighter jets, explosions as shoppers storm supermarkets

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

Dangote Refinery recalls redeployed engineers

May 1, 2026
Olayinka Ijabiyi

FirstBank confirms appointment of Olayinka Ijabiyi as Group Head, Marketing and Corporate Communications

May 1, 2026

2027: APC extends sales of forms, submission deadline

May 1, 2026

FG approves N548.98bn Carter Bridge reconstruction

May 1, 2026
Disu

IGP Disu: Any officer who misuses a weapon or kills unlawfully will be dismissed, prosecuted

May 1, 2026
Agbaje

GTCO posts N302.9bn Q1 profit before tax

May 1, 2026

INEC fixes June 20 for by-elections

May 1, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.