Tuesday, April 28, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

Osinbajo: Kajola Rail Wagon Assembly plant to create 5000 jobs

Femi Adewale by Femi Adewale
November 9, 2019
in News
0
Osinbajo: Kajola Rail Wagon Assembly plant to create 5000 jobs

Osinbajo

Vice President Yemi Osinbajo says the Rail Wagon Assembly Plant construction in Nigeria will generate about 5,000 direct and indirect jobs when completed and boost socioeconomic activities.
Osinbajo made this disclosure while performing the Official Ground Breaking Ceremony for the construction of the plant in Kajola, Ogun State on Saturday.
“The plant, which is a private investment to be undertaken by Messers CCECC, is central in the production of rolling stock, spare parts and maintenance of equipment needed for the railway modernisation programme being implemented by this administration.
“This ceremony is not just another event, it is a historic turning point. For us, the railway is not only an alternative and comfortable mode of travel.
“It holds the master key to transforming commerce in Nigeria and across the continent. By linking our ports to rail lines and now, building the rolling stock locally, import and export business within, into and out of Africa’s largest market will never be the same.
“When completed, it is expected that the plant would produce some parts of the wagons for the Lagos-Ibadan and Abuja-Kaduna rail lines, but also for the central rail lines and to satisfy the needs of other rail operators within the West- African sub-region.
“The plant would offer an important platform for engineers, technicians, artisans and other professionals to gain the specialized skills required for the production and maintenance of rolling stock.
“This will invariably conduce to spin-off businesses in the region of operation and across the country wherever rail networks are in existence.
“The plant is expected to generate about five thousand (5,000) direct and indirect jobs,” Osinbajo said.
According to him, the siting of the plant here in Nigeria and the commitment to hiring Nigerians and Nigerian businesses affirms the Presidents directives in Executive Order 5.
The vice president said that the Order was prioritising Nigerians and Nigerian businesses in the innovation, production and procurement of Engineering projects and services.
He added that the plant would offer an important platform for engineers, technicians, artisans, and other professionals to gain specialised skills required for the production and maintenance of the rolling stock.
According to Osinbajo, the message from President to CCECC is that the company should move “very quickly to the next phase of this project, which is the assembly and construction of coaches and locomotives.
“This for us will be a significant breakthrough and we look forward to hearing from you as quickly as possible when this will come to operation as well.”
Osinbajo highlighted that the Federal Government after completing Abuja-Kaduna standard guage rail line in 2016, moved to Lagos-Ibadan standard guage rail line construction in 2017 which is near completion.
He said that Federal Government had also moved into rehabilitation and completion of the abandoned Itakpe-Ajaokuta-Warri rail line started over three decades ago.
“We signed an agreement with Messrs China Railway Construction Company International to construct the Itakpe-Ajaokuta rail line, which will be extended from Itakpe to Abuja through Baro Inland Water Port in Niger State with a branch line to Lokoja in Kogi State.
“This rail line will link into the new Warri sea port being constructed under the agreement, ” Osinbajo said.
Osinbajo said that the Federal Government had optimised the Lagos-Ibadan standard rail line by extending it to the nation’s busiest port in Apapa for movement of cargos from the ports to various destinations.
The vice president said that the extension would expedite imports and export flow, decongest the port and removed pressure on the road.
“Also, we are putting all mechanisms in place to achieve the swift completion of the Ibadan Inland Dry port, which will off- take containers and cargoes from Apapa port through the Lagos – Ibadan rail line,” he said.
Osinbajo appreciated the support of the host community, Kajola, saying that the continuity of cooperation remained imperative in safeguarding and protecting the project.
In his welcome address, the Minister of Transportation, Mr Rotimi Amaechi, said that the Federal Government awarded contract for the procurement of rolling stock to meet the increasing demand of both passengers and freight services.
“The Ministry of Transportation realising the need of the advantage to set up this type of plant considering the potential need in view of the ongoing rail projects in the country and the sub-region, encouraged Messrs CCECC to establish this plant.
“It is expected that the plant would generate job opportunities for Nigerians and as well facilitate the much-desired objective of the government towards the local content capacity development.”
“This will be the first of its kind in Nigeria and the first batch of the wagons to be assembled from the production line of this plant will form part of the rolling stock for Lagos – Ibadan and Abuja – Kaduna Railway operations,” he said.
According to him, with this, the country will be able to conserve her much needed foreign exchange, which can be deployed to other areas of development.
“It is cardinal to mention that the sustainability of our railway modernisation projects would depend on our ability to develop local capacity to construct, maintain and manage our new railway system.
“It is on this note that we feel that this project is germane to the railway development in Nigeria and that Messrs. CCECC should be given every reasonable support to actualise this investment.
Remarking, the Managing Director of CCECC, Mr Jiang Yigao, said that the company would continue to cooperate with communities and government at all level in its commitment to develop state-of-the-art railway system.
The event was witnessed by several government functionaries, community, religious and traditional leaders.

Tags: Osinbajo: Kajola Rail Wagon Assembly plant to create 5000 jobs
Previous Post

Fashola inaugurates roads constructed by Ade-Ojo in Ilara-Mokin, says ‘infrastructure, basis for community development’

Next Post

Bauchi gov’s wife: I married my husband as a stark illiterate, started school after third child

Next Post
Bauchi gov's wife: I married my husband as a stark illiterate, started school after third child

Bauchi gov's wife: I married my husband as a stark illiterate, started school after third child

John Cardinal Onaiyekan

Pope Francis announces Onaiyekan's retirement

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

Court Closes Defence in Mompha’s N6bn Money Laundering Trial

April 28, 2026

Court Fixes May 8 to Hear Suit Challenging Jonathan’s 2027 Eligibility

April 28, 2026

Lagos Solar Policy Sparks Mixed Reactions Among Residents

April 28, 2026
Naira

NLC: ₦1m monthly salary worthless without stable Naira

April 28, 2026

IPAC Warns Rising Nomination Fees Threaten Nigeria’s Democracy

April 28, 2026

World Bank: Middle East war to spark biggest energy price surge in four years

April 28, 2026

ADC Crisis: Mark Faction Urges CJN to Speed Up Supreme Court Judgment

April 28, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.