Thursday, July 23, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

‘Opebi-Ojota Link Bridge ready by June 2023’

Femi Adewale by Femi Adewale
July 1, 2022
in Breaking News, News
0

The Lagos State Government says the Opebi-Mende-Ojota Link Bridge will be completed by June, 2023.

The Special Adviser to the Governor on Works and Infrastructure, Mrs Aramide Adeyoye, said this at  the commencement of bored piling for the Opebi-Ojota Link Bridge at Maryland, Lagos on Friday.

Bored piling can be literally called a form of building foundation that provides support for structures.

Adeyoye said that with a total length of 3.9 kilometres, the project was designed to provide direct link from Opebi, Mende, Maryland and Ojota to Ikorodu road.

She said that the bridge would reduce the perennial traffic on Mobolaji Bank-Anthony Way, and traffic on other roads around the environment.

According to her, the project designed in conjunction with the Lagos State Ministry of Transportation will not only provide infrastructure solution, but also a transport solution that ensures value and relief for the motoring public.

She said  the project was a vision to reality, and also brought about innovation, as part of the bridge would be for working and exercising for residents.

Adeyoye said  the construction of the bridge would bring about learning opportunities for students and creation of jobs.

On his part, Commissioner for Transportation, Mr Frederic Oladeinde, said the Governor Babajide Sanwo-Olu’s administration was determined to provide infrastructure that would be complemented by decent Inter-modal transportation system, befitting of a mega city like Lagos.

Oladeinde described the project as huge, as it would connect communities to Ojota, and enable commuters to navigate from Ikeja to the Island, and at the same time, reducing travel time.

”So when you look at the population of Lagos, you will understand that it is important that we develop our public transport. To develop the public transport, you must have good infrastructure.

”So we are developing the infrastructure required to ensure that we put a decent public transport on our network for our people.

”One of the reasons why we are working with the ministry of works is to ensure that the junction connection is efficient for public transport to take, because we need to give priority to public transportation.

”So when you look at all the projects that we are doing, it is project that will either connect community on our project or will make our public transport better,” he said.

On January 26,  Sanwo-Olu  announced the kick off of the construction of the bridge, which was conceived over 20 years ago.

Sanwo-Olu described the project as a legacy of his administration to ease the burden of commuters. 

Tags: 'Opebi-Ojota Link Bridge ready by June 2023'
Previous Post

UN Deputy Secretary General, Amina Mohammed, tests negative for COVID-19

Next Post

Tinubu denies meeting Wike in France

Next Post
2023: My plans for Nigeria, by Tinubu

Tinubu denies meeting Wike in France

Ganduje

Court restrains Ganduje from borrowing N10bn for CCTV

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

Court Rejects Sowore’s Bid to Tender Uncertified Document in Defamation Trial

July 22, 2026

Nigerian Stock Market Loses N801bn as Profit-Taking Ends Three-Day Rally

July 22, 2026

INEC Urges Ondo Residents to Complete Voter Registration Before July 26 Deadline

July 22, 2026

NAFDAC Begins Nationwide Crackdown on Banned Sachet Alcohol, Small PET Bottles

July 22, 2026

APC Rejects Atiku’s Claim That ₦12.8tn Service-Wide Vote Will Fund Tinubu’s 2027 Campaign

July 22, 2026

Reps Urge FG to Fund Nigerian Drone Manufacturers to Strengthen Security Operations

July 22, 2026

Anambra Launches Plea Bargain Initiative, Excludes Murder, Kidnapping, Armed Robbery and Rape Cases

July 22, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.