Friday, October 9, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

Omotosho 500MW power plant ready for inauguration – Contractor

Freedom Reporter by Freedom Reporter
October 18, 2013
in Featured, News
0
Share on FacebookShare on TwitterShare on Whatsapp

jonathan_commissions_geregu_power_plant2Mr Liu Zhao-Long, the Managing Director, China Machinery Engineering Corporation, on Friday said that the Omotosho 500 Mega Watts (MW) Power Plant in Ondo State was set for inauguration on Saturday.

Zhao-Long told the News Agency of Nigeria (NAN) in Lagos that the four gas turbines would be inaugurated by President Goodluck Jonathan.

He said that the project would be added to the national grid.

“We are set to commission the Omotosho Phase 2. The four turbines are contributing 500MW to the national grid.

“We have completed all the test running, and we find it imperative to hand it over to government after the warranty period of a year in overseeing the plant,“ Zhao-Long said.

He commended the effort of the Federal Government towards ensuring the availability of stable electricity supply to Nigerians.

The plant is the second of the 10 Nigerian Independent Power Projects (NIPP) under the management of the Niger Delta Power Holding Company (NDPHC) Ltd. to be inaugurated.

The 10 power plants include the already inaugurated 434MW Geregu II, Calabar 630MW, Egbema 378MW, Ihorvbor 504MW and Gbarain 252MW,

Others are Sapele 504MW, Omoku 252MW, Alaoji 1076MW, and Olorunsogo 750MW.

The project was initiated in 2004 by the then government of former President Olusegun Obasanjo, under the coordination of the then Minister of Power, Liyel Imoke, now the Governor of Cross River.

But the project was abandoned between 2007 and 2009 due to funding arrangements.

Work resumed on Omotosho power plant project in 2010.

President Goodluck Jonathan on Oct.4, inaugurated the 434MW Geregu II in Kogi.

 

 

Share25Tweet16Send
Previous Post

Eaglets eye fourth U-17 World title

Next Post

Saudi Arabia declines Security Council seat

Next Post

Saudi Arabia declines Security Council seat

Abdulsalami

Abdulsalami urges ASUU to end strike

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

Chief killed by accidental discharge during funeral

October 8, 2026

NLC gives FG two-week ultimatum to reduce petrol price, renegotiate minimum wage

October 8, 2026

Kwara APC: How a succession battle became a political earthquake – Ehi Braimah

October 8, 2026
Nigerian Guild of Editors

Editorial: NGE replies The Nation newspaper’s editorial board, says ‘it failed journalism’

October 8, 2026
Oyebanji

OYEBANJI PRESENTS N490.740BN 2027 BUDGET TO EKITI ASSEMBLY

October 8, 2026

Atiku to Tinubu: Your 30-day petrol discount ‘too little, too selective, too political’

October 8, 2026
Motsepe and Infantino

FIFA Presidency: CAF endorses Infantino

October 8, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.