Monday, November 23, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

Ogun begins construction of three bridges

Freedom Online by Freedom Online
February 22, 2015
in Breaking News, News
0
PDP to Ogun voters: Adebutu is our governorship candidate, disregard an impostor

PDP to Ogun voters: Adebutu is our governorship candidate, disregard an impostor

Share on FacebookShare on TwitterShare on Whatsapp

In fulfilment of his campaign promises, the Senator Ibikunle Amosun-led administration has started the construction of three bridges which were hitherto narrow along Imeko Afon and Agosasa- Ipokia road in Ogun State.
These narrow bridges, which had claimed many lives and properties over the years are situated at Odo-Oyo and Afon along Imeko-Afon road in Imeko-Afon Local Government and at Odo-Oniru in Agosasa, Ipokia Local Government Area.
Commissioner for Works and Infrastructure, Olamilekan Adegbite, who made this known during an inspection of the bridges, said the works are being done by contractors who are experts in bridge construction
Adegbite said the Amosun decided to put an end to unnecessary waste of lives and properties along the three axis by immediately awarding the contract and mobilizing contractors to sites without any delay.
He added that construction of the three bridges has started in earnest, saying that the bridges would have four carriage lanes each to give enough space for vehicles plying the roads.
Accordingly to him, “construction of the bridges had started simultaneously at Odo-Oyo, Odo-Afon in Imeko-Afon and Odo-Oniru in Ipokia, they were issues raised during the campaign tours of the Governor to the areas”.
The commissioner said new bridges were being constructed in place of the already weak narrow ones which were constructed many decades ago.
When completed, the bridges are expected to reduce hours spent in traffic on the roads, reduce carriage often experienced and open up the areas to industrial growth and development.

Share25Tweet16Send
Previous Post

Scores killed in Potiskum bomb explosion

Next Post

NIMASA gives APC 72-hour ultimatum to withdraw allegation

Next Post

NIMASA gives APC 72-hour ultimatum to withdraw allegation

Fayose: Mark my words, Buhari will never be president

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

Tinubu and Sanwo-Olu

Tinubu to Nigerians: “In 2022, I invoked ‘Emilokan’s spirit’, now, it is ‘Eyinlokan’ to make my re-election possible”

November 22, 2026
UBA

UBA’s total assets surge to ₦34.96trn as operating income jumps 12.7% in 9M 2026

November 22, 2026

Bayelsa boat mishap: Tinubu donates N250m to victims

November 22, 2026
Braimah

Nigeria’s electricity crisis: Enough of excuses, Nigerians deserve reliable power – Ehi Braimah

November 22, 2026

NDLEA ​‌‍‌‌‍⁠⁠‍‍⁠‌‍‍‍‌​‌​arrests South African professional golfer, Kenyan chef over drug trafficking in Lagos

November 22, 2026

Umahi to Igbo in Lagos: Vote for Tinubu

November 22, 2026
NPFL

NPFL: Rivers United, Barau in top form as Rangers defeat Shooting Stars

November 22, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.