Thursday, April 23, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

NNPC signs $2.8bn contracts for 614km gas pipeline project

Roland Edwards by Roland Edwards
April 6, 2018
in Breaking News, Business, News
0
IATF2021: Afreximbank, NNPC sign $1.04bn facility for oil exploration

NNPC

The Nigeria National Petroleum Corporation (NNPC) has signed contracts for engineering, procurement, construction, commissioning and financing for 614km Ajaokuta-Kaduna-Kano (AKK) Gas Pipeline and Stations.

NNPC spokesman, Mr Ndu Ughamadu, made this known in a statement on Friday in Abuja.

He said the AKK Gas Pipeline and Stations Project comprised Lots 1 and 3, and measured 40inch x 614km.

According to him, the agreement, which is 100 per cent contractor-financing model, has been signed with a consortium of indigenous and Chinese companies.

“Under the terms of contract, Lot 1, with total length of 40 inch x 200km stretching from Ajaokuta to Abuja Terminal Gas Station (TGS), was awarded to the OilServe/Oando Consortium.

“Lot 3, which runs from Kaduna TGS to Kano TGS with a total length of 40inch x 221km, was awarded to the Brentex/China Petroleum Pipeline Bureau Consortium.

“It is envisaged that contract agreement for Lot 3 which covers 40inch x 193km, stretching from Abuja to Kaduna, will be executed in the weeks ahead,” he said.

According to the official, the AKK Project is a section of the Trans-Nigerian Gas Pipeline under the Gas Infrastructure Blueprint designed to enable industrialisation of the Eastern and Northern parts of Nigeria.

He added that the project would enable connectivity between the East, West and North, currently non-existent.

Ughamadu noted that the AKK section had suffered setbacks due to scarce resources, hence, the adoption of the contractor-financing model.

“The two other pipelines, the OB3 and ELPs 2 in the Gas Master Plan Blueprint, are currently at various stages of completion and financed directly by the Federal Government,” he said.

The spokesman quoted the Chairman of Oilserve/Oando Consortium, Mr Emeka Okwuosa, as lauding the Federal Government and the NNPC for providing the opportunities for indigenous companies to flourish in the oil and gas industry.

According to the NNPC official, Okwuosa said that award of Lot 1 of the AKK Project to an indigenous consortium showed government’s determination to encourage local content philosophy.

The process for the award of the AKK Project began in July, 2013 with advertisement for tenders published by the NNPC in major national newspapers.

After a technical and commercial evaluation process, the Federal Executive Council at its 46th meeting on December 13, 2017, approved the contract valued at over $2.8 billion.

Tags: nnpc
Previous Post

Blame your chiefs if you don’t get Rivers governorship, Amaechi tells Opobo people

Next Post

$2.5bn arms deal: Zuma waves corruption charges aside

Next Post
Zuma

$2.5bn arms deal: Zuma waves corruption charges aside

Oil spillage: Court orders Mobil, NNPC to pay N81.9bn in damages to Akwa Ibom communities

Mobil Oil tops losers' table as NSE trades 501.96m shares worth N5.85bn

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

Okpebholo Backs Tinubu’s Re-election as City Boy Movement Visits Edo

April 23, 2026

Poor Network? NCC Mandates Airtime Compensation for Subscribers

April 23, 2026

Obudu Cargo Airport Reaches 90% Completion – Cross River Govt

April 23, 2026

UBA GMAP: The Ultimate Career Gamechanger Gen Zs Wouldn’t Stop Talking About

April 23, 2026

Trump to give Iran days to agree on unified proposal

April 23, 2026
Tinubu

Tinubu seeks Senate’s approval for $516m loan for Sokoto–Badagry Superhighway

April 23, 2026

FG to Grant Debt Discounts to Airlines Amid Rising Aviation Costs

April 23, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.