Tuesday, April 21, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

Nigeria leans on Project Manager, Ifeanyi Okowa, for 21st National Sports Festival, by Chido Nwakanma

Freedom Reporter by Freedom Reporter
July 5, 2022
in News, Opinion, Sports
0

“Asaba 2022 will be the best in terms of infrastructure and others that will be in place in the next few months. We have the personnel to stage a fun-filled and friendly sports festival from the beginning to the end”.
Host governor, Dr. Ifeanyi Okowa, pledged in 2021 to deliver to Nigeria a superlative National Sports Festival as the Federal Ministry of Sports awarded the hosting rights to the twenty-first national sports festival to Asaba, the Delta State capital. There is excitement in the sports community as they look forward to a positive manifestation of the words of Ifeanyi Okowa.
High expectations follow the prospects of Asaba 2022 running from 2 through 15 November 2022. Those expectations rely on the tried and tested Human Capacity management principle that past performance is a predictor of potential. The other expression is “the taste of the pudding is in the eating”.
The sports community has tasted and tested Okowa’s capacity in sports policy and administration. Plaudits attend each one. He walks in what persons in the communication recognise as above-the-line, below-the-line and through-the-line within sports.
Okowa is a sports lover and patriot who intervened many times to save Nigeria’s blushes when it wavered on the hosting of the African Athletics Meet in 2018. Our country pledged to host, then began fumbling and wobbling, as Coach Fanny Amun famously described dithering. Okowa stepped to the rescue.
Before and after that, Okowa is one governor who rallies to the national call for the training and equipping of our sports team. He took on the task of grooming twelve athletes for the Tokyo Olympics. Two did very well, including Ese Brume of Delta State.
These below-the-line building efforts hardly cut ice with the skeptical public nowadays. Nigerians have become like the biblical Thomas insistent on seeing and touching. Okowa offers a grand edifice for such persons to see.
The Stephen Keshi Stadium Asaba is a testimony and testament to the project management acumen of Ifeanyi Okowa. He converted a dream of Delta State for 17 years into the reality of a stadium that serves the local, national, and international sports community. Yes, the building of the Stephen Keshi Stadium, Asaba took 17 years until a determined Okowa broke the jinx.
By delivering the stadium, Okowa saved Nigeria’s embarrassment. The country then hosted the African Senior Athletics Championships, Asaba 2018, from 1-5 August 2018. It was a masterclass in project management.
First, several hiccups hit the first few days of the competition. Critics went to town to excoriate the governor, the Local Organising Committee, Delta State government.
Logistics management suffered under the management of the National Sports Commission. Athletes screamed. The media amplified it, and columnists on print and online went to town.
There were critical glitches at the commencement with flight connections for athletes. The Delta State Governor, Dr. Ifeanyi Okowa, engaged chartered flights to solve the problem, though it was not the remit of the State Government to handle that aspect of the logistics. At the end of the competition, there were no further incidents with flights or accommodation with the State Government taking charge. Indeed, by the time the games commenced, the initial disappointment caused by the airport delay had become a distant memory. Instantly, some of the athletes and visiting journalists changed their tune. For instance, Wesley Botton, one of the journalists, tweeted: “After a horribly wobbly start, the Local Organising Committee pulled through today at the African Championship.”
Fifty-two countries participated in Asaba 2018. It was five more countries than in the previous tournament. Eight hundred athletes in attendance created a tournament record. Events in the contest increased from 44 to 46.
Stephen Keshi Stadium boasted luxurious new tracks that passed the certification tests of the International Association of Athletics Federation (IAAF) and the Confederation of African Athletics weeks before the games commenced. Asaba 2018 complied with all rules guiding international athletic championships.
Stephen Keshi Stadium is currently one of the few stadia in Nigeria with fully covered stands. It has high-quality warm-up tracks, equipment, and facilities. The stadium that Ifeanyi Okowa built in Asaba is now part of the sporting, cultural and entertainment landmarks, and calendar of Asaba and Delta State.
Now you see why Sports Minister Sunday Dare and the folks in the sports community enthuse me about Asaba 2022. Governor Okowa and his team have already promised to deliver a first-rate Games Village and other infrastructure. Work is ongoing.
When a project matters, Nigeria turns to a tested project manager called Dr. Ifeanyi Okowa.

Tags: Nigeria leans on Project Manager Ifeanyi Okowa for 21st National Sports Festival by Chido Nwakanma
Previous Post

Yobe North: Machina raises the alarm over ‘unholy alliance by compromised APC leaders to forge my withdrawal letter’

Next Post

Dangote Cement to reward consumers with N1bn in new Promo

Next Post

Dangote Cement to reward consumers with N1bn in new Promo

Oil & Gas Conference: Barkindo, Kyari, Mshelbila, others at NLNG’s Exhibition Stand

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

Pope Leo

Pope Leo XIV pays tribute to predecessor on anniversary of his death

April 21, 2026

U.S. forces board sanctioned Iran-related oil tanker in Indian Ocean

April 21, 2026

Mother, son ‘travelling to Holy Land for pilgrimage’ die in auto crash

April 21, 2026
Edun

Tinubu sacks Wale Edun, Dangiwa; Oyedele becomes Finance Minister

April 21, 2026

IGP Disu Restructures Police Monitoring Unit to Strengthen Discipline

April 21, 2026

Cross River Confirms New COVID-19 Case, Activates Emergency Response

April 21, 2026

FG to Arraign Alleged Coup Plotters on Treason, Terrorism Charges

April 21, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.