Friday, October 9, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

NERC: 8.951,869 MWh generated in Q1 2019

Ola Simeon by Ola Simeon
September 16, 2019
in Breaking News, Business, News
0
Power

Power

Share on FacebookShare on TwitterShare on Whatsapp

The Nigerian Electricity Regulatory Commission (NERC) says the total electric energy generated in the First Quarter of 2019, is 8.951, 869 Megawatts-hour (MWh).

NERC made this known in its first quarter report on Monday in Abuja from its website.

The commission said during the first quarter of 2019, the total electric energy generated was 8.951, 869  MWh, 0.8 per cent higher than the level of generation during the fourth quarter of 2018.

“During the quarter, the industry recorded the peak generation of 5,375MW. However, the available plant generation units declined to 61 from the daily average of 72 recorded in the last quarter of 2018.

“ In spite of the decline in the available generation units in the first quarter, the total energy generation rose by 0.8 per cent with 8.9 per cent points increase in generation capacity utilisation.

“Arising from the reduction in the constraints of insufficient gas supply, transmission and distribution networks, and water management at the hydro-power stations.

“In spite of the marginal improvement in sector performance during the quarter under review, the aforementioned industry constraints continue to pose major technical and operational challenges to the industry,’’  the commission said.

The commission said that the complete resolution of the highlighted technical and operational constraints in the Nigerian Electricity Industry remains as one of its top priorities.

It said that the commission had continued to work on addressing the Electricity Distribution Company (DisCo) and the Transmission Company of Nigeria (TCN) interface bottlenecks.

This was with the aim of freeing up the generation capacity constraint by addressing the constraints inhibiting the flow of energy.

The reporter said that the commission was further committed to utilising a more robust process for the thorough technical assessment of DisCos’ utilisation of capital expenditure allowances for relevance and cost efficiency.

“To ensure that utilities invest on projects critical to addressing the technical and operational challenges bedevilling operational efficiency.

“Pursuant to this effort, the commission has formally approved the Performance Improvement Plan Guidelines to be issued to DisCos for the preparation of their investment plan.

“This process is consistent with the regulatory imperative of ensuring that consumers do not pay for inefficiencies of the utilities’ the commission said. 

Tags: NERC: 8.951869 MWh generated in Q1 2019
Share25Tweet16Send
Previous Post

Guardiola: We’ll be back

Next Post

Oil soars after attacks on Saudi, weak China data hits shares

Next Post

Oil soars after attacks on Saudi, weak China data hits shares

PDP Reps call for re-instatement of Achuba as Kogi deputy governor

Kogi dep gov sues Yahaya Bello over non-payment of N921.5m statutory allocations, travel allowances, security votes

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

Chief killed by accidental discharge during funeral

October 8, 2026

NLC gives FG two-week ultimatum to reduce petrol price, renegotiate minimum wage

October 8, 2026

Kwara APC: How a succession battle became a political earthquake – Ehi Braimah

October 8, 2026
Nigerian Guild of Editors

Editorial: NGE replies The Nation newspaper’s editorial board, says ‘it failed journalism’

October 8, 2026
Oyebanji

OYEBANJI PRESENTS N490.740BN 2027 BUDGET TO EKITI ASSEMBLY

October 8, 2026

Atiku to Tinubu: Your 30-day petrol discount ‘too little, too selective, too political’

October 8, 2026
Motsepe and Infantino

FIFA Presidency: CAF endorses Infantino

October 8, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.