Friday, April 3, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

Lagosians angry as contractors abandon Third Mainland Bridge repairs

Femi Adewale by Femi Adewale
February 19, 2017
in Breaking News, News
0

The Federal Road Maintenance Agency (FERMA) has come under heavy criticism from residents in Lagos over the abandonment of the repair works on Third Mainland Bridge and other adjoining roads.
The Agency, last month, had begun repairs on both carriage ways of the Bridge, scrapping the asphalt on some sections of the bridge, but had vacated site for over two weeks, leaving motorists to contend with the current state of the road.
Motorists had attributed several accidents which had occurred on the Bridge in recent times to the uncoordinated method by which FERMA was carrying out the repair works.
But investigations, at the weekend, however, showed that though N10 billion was voted for FERMA in the 2016 Budget of the Federal Ministry of Works, the contractor engaged for the job was yet to be mobilised.
With the March 31, 2017 date for the end of the implementation of the 2017 budget fast approaching, FERMA had hurriedly moved the contractor to site. However, its failure to mobilize them led to the repair works being stalled.
Some motorists in the state are, however calling on the Minister of Works, Mr. Babatunde Fashola, to rise to the challenge and ensure that the Agency completes the repair works so as to save motorists the nightmare and the incessant accidents caused by the present state of the Bridge.
Mr. Babajide Kasali, a motorist who plies the axis on a daily basis, decried the long hours of traffic occasioned by the slow pace of the repair works, saying that it was gradually taking a toll on his health and productivity. 
Another motorist, Mrs. Abidemi Otegbola, said FERMA’s inability to carry out its duties was due to lack of proper monitoring by the parent ministry, as Fashola already has his hands full with responsibilities from the Power and Housing ministries. 

Tags: fasholaThird mainland bridge
Previous Post

How to reduce unemployment in Nigeria, by Abia Governor Ikpeazu

Next Post

Hard times await parents as Oyo Govt stops subventions to tertiary institutions

Next Post
Ajimobi: Buhari, Tinubu, Sanwo-Olu, Fayemi, Oyetola, Ambode, PDP, others mourn

Hard times await parents as Oyo Govt stops subventions to tertiary institutions

APC youths slam Oyo Commissioner over alleged abuse of office

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

WELA Requests Update On Alleged Sexual Violence in Delta, Calls for Ban on ‘Raping Festival’

April 3, 2026
Amupitan

INEC dismisses calls for Chairman’s removal, clarifies misconception over voter revalidation

April 2, 2026

APC to ADC: You are the architect of your misfortune

April 2, 2026

Adelabu’s Power Lines as Laundry Lines – Azu Ishiekwene

April 2, 2026

Why 57 properties linked to Malami should be permanently forfeited to FG – EFCC

April 2, 2026

ADC: Tinubu wants to be the only presidential candidate in 2027

April 2, 2026

RE: INEC CEASES TO RECOGNISE THE DAVID MARK-LED CARETAKER COMMITTEE. A CASE OF POLITICAL SUICIDE AND BAD MARKET, BY DUMEBI KACHIKWU

April 2, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.