Saturday, April 18, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

Lagos Blue Line Rail project at 90% completion, says Sanwo-Olu

Femi Adewale by Femi Adewale
April 25, 2022
in Breaking News, News
0

Governor Babajide Sanwo-Olu of Lagos State, on Sunday, said that work on the Blue Line rail project is at 90 per cent completion.

Sanwo-Olu disclosed this while speaking with newsmen at the Marina Train Station, after about three hours inspection of the ongoing work on the Blue Line rail project and stations at the National Theatre Iganmu, Orile, Suru Alaba, Mile 2 and Marina axis of the state.

He said that the state government is on track at completing work on both the Blue and Red lines rail projects, which are intra-city, to strengthen the intermodal transportation system.

According to him, contractors are working seven days a week, so that residents will ride train on the rail by the first quarter of 2023.

Sanwo-Olu

He said that the blue line rail would be running on electric tracks with Electric Motor Vehicle (EMV) and therefore, warned residents to keep off the train lines and ensure they don’t walk on it.

The governor also inspected a new four-coach train, which, according to him, is the typical train that would be used on the blue line.

He said that the Lagos State Government plans to bring additional two sets of four-train coaches from China between September and October.

According to him, adequate security will be put in place at every train station and platform with the use of CCTV.

”This is the first time I am taking you on the blue line to see where we are. The first phase of the Blue line rail project starts from Mile 2 and terminates at Marina.

”Marina Station is an elevated station and it stretches out to outer Marina and terminates where the Governor’s residence is. At the end of the station, you could see that the track is broken into two bridges. The backtrack is for parking.

”We are happy that the contractors are working seven days a week. The major aspect apart from the Marina Station is a sea crossing from Eko Bridge to join the outer Marina. They would finish it in about three months.

”We will be coming back in July, during which the concrete construction should have been completed,” he said.

Sanwo-Olu condemned the level of vandalism along the rail corridors and warned perpetrators to desist from such evil acts.

He said that the government would go after companies that buy vandalised rail tracks infrastructure, and that culprits would be traced and made to face the full wrath of the law.

Tags: Lagos Blue Line Rail project at 90% completion says Sanwo-Olu
Previous Post

Schröder’s defence of Putin ‘downright absurd,’ says SPD leader

Next Post

International students in Canada face hardship because of food price increase

Next Post

International students in Canada face hardship because of food price increase

Odetunde, Imomoh advise Augustine University students on 'how to achieve life goals'

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

Former NFF Chairman dies at 75

April 18, 2026

UniAbuja Graduates 17,200 Students, Honours Odili, Others at Convocation

April 18, 2026

NGX Chairman Calls for Balanced Regulation to Boost Digital Assets in Nigeria

April 18, 2026

FCCPC Denies Ban on Airtime Borrowing and Data Advance Services in Nigeria

April 18, 2026

UTME 2026: JAMB Reports Minimal Issues, Warns Candidates Against Exam Fraud

April 18, 2026

NEMA Warns Lagos Residents of High Flood Risk, Urges Immediate Precautions

April 18, 2026

CBN, FMDA announce new money market benchmark

April 18, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.