Thursday, May 7, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

How we arrived at new cost of Moniya-Ijaiye-Iseyin Road, by Oyo Govt

Femi Adewale by Femi Adewale
November 6, 2019
in Breaking News, News
0
Insecurity: Gani Adams urges FG to declare state of emergency on roads

Road

 
The Government of Oyo State, on Wednesday, clarified how it arrived at the new cost of the all-important Moniya-Ijaiye-Iseyin road, which links the food basket of the state, Oke-Ogun.
 
A statement by the Chief Press Secretary to Governor Seyi Makinde, Mr. Taiwo Adisa, quoted the State’s Commissioner for Infrastructure, Works and Transport, Prof Raphael Afonja, as stating that the new contract was a clear departure from the rehabilitation contract given out at the cost of N7 billion by the administration of the immediate past Governor Abiola Ajimobi.
 
The statement indicated that the total reconstruction of the 65-kilometre Moniya-Ijaiye-Iseyin Road was arrived at taking into consideration the extensive reviews of the components and the desire to construct a road that would withstand the test of the huge traffic on the road.
Afonja said that the cost of the new road, which is expected to be completed in 12 to 14 months, stands at N9.9 billion.

He stated that the road belongs to Oyo State and that it links the state capital with the food basket of the state, which also serves as the solid mineral belt of the state.
 
“The contract to be executed by KOPEK Construction Company should be of high quality, being the road linking the food basket of the state,” the statement read.

He added that some of the components of the road reviewed by the state executive council and which informed the increment in cost include the design of the project, price fluctuation, asphaltic wearing cost and adequate drainage system.

The statement quoted the Commissioner as saying: “Let me say this quickly, Moniya-Iseyin road is not a federal road but a state road. Oyo-Iseyin is the federal road. In terms of the amount, it is actually N9,929,702,66, which is approximately N9.9bn. The question that may arise is the initial award that was approximately N7bn.

“However, we have reviewed the design to make sure that the road that will be constructed for this important food basket of the state has high quality.

“We have made some changes including the design. We increased the stone base core from 150mm to about 200mm. We also changed the asphaltic wearing cost from 40mm to 50mm. We also realised there was an inadequate provision for drainage system along that road in the initial design but we have changed that to provide adequate drainage system.

“Also, we considered the fluctuation basically in terms of pricing of materials, bitumen for example. That was also factored into the new pricing. Another thing is, the road will last for, at least, minimum of 10 years.”

The statement further indicated that the immediate past administration of Senator Abiola Ajimobi had, in February 2018, awarded the contract for the rehabilitation of the road at the cost of N7 billion, out of which N2 billion was paid to the Contractor who could not deliver on the terms.
The contract has since been revoked by the state government which has asked the contractor to refund the bogus payment.

Tags: How we arrived at new cost of Moniya-Ijaiye-Iseyin Road by Oyo Govt
Previous Post

P&ID scandal: Trial of ex-Director, Legal Services begins

Next Post

Three migrants found dead in sea off Lanzarote

Next Post
Three migrants found dead in sea off Lanzarote

Three migrants found dead in sea off Lanzarote

EFCC

EFCC returns recovered vehicles to university authority

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

From left is the District Treasurer, Rtn. Omale Agida;  District Executive Secretary, Rtn. Eucheria Ekweozoh; the District Governor, Dame Princess Joy Nky Okoro; the District Conference (DISCON) Chairman, Dr. Emeka Iloegbunam, and the District Public Image Chairperson, Rtn. Ogechukwu Ochuba at a pre-DISCON press briefing in Abuja.

Rotary to honour humanitarian, leadership icons at DISCON 2026 in Abuja

May 6, 2026
Yahaya Bello

I had no business dealings with Yahaya Bello, EFCC witness tells court

May 6, 2026
Court

NGO Executive Director, Adeolu Oyinlola, floors Lagos Task Force in court, awarded N7m compensation for impounded car

May 6, 2026

PDP Interim NWC: Wike can’t do anything about ongoing sales of nomination forms

May 6, 2026

ACF NEC suspends BOT chairman, orders forensic audit over alleged malfeasance

May 6, 2026

NLNG receives 98 entries for creative arts prize

May 6, 2026
Senate

Senate confirms Tegbe as Minister of Power

May 6, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.