Sunday, October 4, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

GENCOS: We have installed power generation capacity of 12,000 megawatts

Roland Edwards by Roland Edwards
April 20, 2017
in Business, Energy, News
0
Share on FacebookShare on TwitterShare on Whatsapp

The Association of Power Generation Companies (APGC), says it has the capacity to generate 12,000 Mega Watts (MW) to reduce the electricity needs of Nigerians.
The Executive Secretary of APGC, Joy Ogaji, disclosed this in Abuja on Thursday.
Ogaji said the GENCOs currently have available 8,000 MW capacity, given the readiness of the transmission and distribution networks to absorb the power generated.
“ Currently, the generation companies have an installed capacity of 12,500 MW if you put all of them together, they have a capacity to give Nigerians 12,500MW.
“Then they have an available capacity of 8,000MW, out of that 8,000MW, Transmission Company or the transporter that can take this power from us to give to the distribution has a capacity of maximum 5,500, which is what they claim, but we believe they can’t take more than 4,500.
“A system stress test that was conducted on the distribution lines shows that  the distribution companies (DISCOs), can take a maximum of 4,600MW.
“With the available capacity I have 8,000MW if I say okay, come and take no one can take’’.
On current reduction in generation despite its capacity to produce more, she said paucity of funds hindered GENCOs from procuring gas to fire their power plants.
“ For now we don’t have vandalism problem but inability to pay for gas.
“How do we pay for the gas, my people were paid a week ago for the electricity generated in January.
“And when they put 100 per cent on the grid, maximally they have been paid 30 per cent, of the money this is one of the issues,’’ she said.
“As we speak, the sector owes the generation companies about N600 billion, unpaid for power that have be generated and consumed already, about N600 billion.
“Now Federal Government came to announce on March 1, that they are bringing N701 billion for the generation companies.
“ Where is this money, that N701 billion where is the money, we have written to government, please show us where this money is.’’
Ogaji also said it was important to overhaul the transmission and distribution networks in the country to facilitate the supply of more electricity to Nigerians.
She said the GENCOs were ready to advance power generation in the country.

Tags: gencospower
Share25Tweet16Send
Previous Post

Naira consolidates gain against dollar

Next Post

Presidency: Suspended NIA boss did not cry

Next Post

Presidency: Suspended NIA boss did not cry

Eight-day fidau for Alhaja Taibat Dosunmu

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

Wunti warns Africa against repeating Oil mistake with Lithium, Cobalt, Rare Earths

October 3, 2026

FG: Nigeria’s Annual Wheat Output Rises From 120,000 to 420,000 Tonnes

October 3, 2026

Moniepoint CEO Tosin Eniolorunda Named Among TIME100 Next 2026 Leaders

October 3, 2026

NYSC Abduction: IGP Sends DIG Operations to Imo to Lead Rescue Effort

October 3, 2026

Yorubaland Islamic Council Declares Support for Tinubu, Hamzat Ahead of 2027

October 3, 2026

Why Nigerian Airlines Fail: Expert Identifies Poor Management, High Costs and Training Gaps

October 3, 2026

Soludo Swears In 21 Anambra LG Chairmen, Tasks Them on Service Delivery

October 3, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.