Friday, April 24, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

GENCOS: We have installed power generation capacity of 12,000 megawatts

Roland Edwards by Roland Edwards
April 20, 2017
in Business, Energy, News
0

The Association of Power Generation Companies (APGC), says it has the capacity to generate 12,000 Mega Watts (MW) to reduce the electricity needs of Nigerians.
The Executive Secretary of APGC, Joy Ogaji, disclosed this in Abuja on Thursday.
Ogaji said the GENCOs currently have available 8,000 MW capacity, given the readiness of the transmission and distribution networks to absorb the power generated.
“ Currently, the generation companies have an installed capacity of 12,500 MW if you put all of them together, they have a capacity to give Nigerians 12,500MW.
“Then they have an available capacity of 8,000MW, out of that 8,000MW, Transmission Company or the transporter that can take this power from us to give to the distribution has a capacity of maximum 5,500, which is what they claim, but we believe they can’t take more than 4,500.
“A system stress test that was conducted on the distribution lines shows that  the distribution companies (DISCOs), can take a maximum of 4,600MW.
“With the available capacity I have 8,000MW if I say okay, come and take no one can take’’.
On current reduction in generation despite its capacity to produce more, she said paucity of funds hindered GENCOs from procuring gas to fire their power plants.
“ For now we don’t have vandalism problem but inability to pay for gas.
“How do we pay for the gas, my people were paid a week ago for the electricity generated in January.
“And when they put 100 per cent on the grid, maximally they have been paid 30 per cent, of the money this is one of the issues,’’ she said.
“As we speak, the sector owes the generation companies about N600 billion, unpaid for power that have be generated and consumed already, about N600 billion.
“Now Federal Government came to announce on March 1, that they are bringing N701 billion for the generation companies.
“ Where is this money, that N701 billion where is the money, we have written to government, please show us where this money is.’’
Ogaji also said it was important to overhaul the transmission and distribution networks in the country to facilitate the supply of more electricity to Nigerians.
She said the GENCOs were ready to advance power generation in the country.

Tags: gencospower
Previous Post

Naira consolidates gain against dollar

Next Post

Presidency: Suspended NIA boss did not cry

Next Post

Presidency: Suspended NIA boss did not cry

Eight-day fidau for Alhaja Taibat Dosunmu

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

Akpabio and Eno

Akpabio to Governor Eno: At 62, you embody the grace of God, quiet strength of purposeful leadership

April 23, 2026
Yahaya Bello

Yahaya Bello: Court fixes April 24 for ruling on EFCC’s plea to re-present exhibit to witness

April 23, 2026

Dapo Abiodun’s senatorial endorsement is ‘kangaroo arrangement’, insist Gbenga Daniel’s loyalists

April 23, 2026

Obasa: Hamzat is next Governor of Lagos

April 23, 2026

OAU 400-Level medical student dies during clinical examination

April 23, 2026

U.S./Israel-Iran war: Tinubu assures UAE, other Gulf states of Nigeria’s solidarity

April 23, 2026

Dangote, Museveni, Ruto, Zubairu meet in Kenya

April 23, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.