Thursday, May 14, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

Fire: TCN, GENCOs working to restore operation of national grid

Freedom Reporter by Freedom Reporter
January 3, 2018
in Breaking News, News
0
Fashola: Technology crucial to sustainable development of settlements

Babatunde Fashola

 

 

Regrettably, after a sustained period of increasing production and distribution of power since September 2017 to date, the Nigerian Gas Processing and Transportation Company Ltd (NGPTC) has reported a fire incident on its Escravos Lagos Pipeline System near Okada, Edo State on Tuesday, 2nd January, 2018.
The incident requires a shutdown of the pipeline supplying gas to Egbin 1,320MW; Olorunsogo NIPP 676MW, Olorunsogo 338MW, Omotosho NIPP 450MW, Omotosho 338 MW and Paras 60MW power stations.
The sudden loss of generation due to interruption in gas supply from these stations caused the national transmission grid to trip off around 20:20 on 2nd January 2018. The national transmission grid is owned and operated by the Transmission Company of Nigeria (TCN).

Most of Nigeria’s power generation is from thermal power stations that require gas for fuel. The gas is produced by oil and gas companies overseen by the Ministry of Petroleum Resources. The gas is delivered to the power stations through pipelines owned and operated by Nigerian Gas Processing and Transportation Company Ltd (NGPTC), a subsidiary of Nigerian National Petroleum Company (NNPC).

TCN and the generation companies are working to restore operation of the national grid. Once the national grid is restored output from the hydroelectric power stations and all other unaffected gas fired thermal power stations will be increased to the extent possible to minimize the impact of loss of generation from the affected power stations while NNPC takes necessary steps to restore gas supply.

We urge members of the public to bear with us as we work to overcome this set back which should be temporary.

Signed:

MINISTRY OF POWER, WORKS AND HOUSING

 

Tags: gencospowertcn
Previous Post

Lagos seals off suspected Badoo kingpin, Alaka’s filling station, hotel, event centre

Next Post

Teenage suicide bomber kills five worshippers in Borno mosque

Next Post
bomber

Teenage suicide bomber kills five worshippers in Borno mosque

dickson

Stay away from cultism, Dickson warns Bayelsa youths

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

ABICS to host online training on Project Management, features Prof Badiru

May 13, 2026
Olusi

Media remains Nigeria’s biggest development partner, says BOI MD Olusi

May 13, 2026

NDLEA intercepts N10.4bn Canadian loud at Lagos port

May 13, 2026
Yuan

Yuan weakens to 6.8431 against dollar

May 13, 2026

Hormuz: We don’t need China’s help, says Trump

May 13, 2026

NDC Sets N60 Million Fee for Presidential Ticket in 2027 Election Cycle

May 13, 2026

Trump in Beijing, says ‘Xi Jinping has been relatively good’

May 13, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.