Thursday, October 22, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

FG to close Ijora Bridge in Lagos for repairs

Femi Adewale by Femi Adewale
April 21, 2025
in Breaking News, Construction
0
Share on FacebookShare on TwitterShare on Whatsapp

The Federal Government has announced full closure of the Ijora Bridge in Lagos, starting from April 27, for critical repair works.

The Federal Controller of Works, Lagos, Mrs Olukorede Kesha, made this known during an inspection of the bridge on Monday.

She said that the bridge connecting Ijora Causeway to Apapa needed comprehensive repairs, especially replacement of defective bearings beneath the deck.

Kesha said: “This bridge has been awarded for some time now in different phases.

“We are now at the final phase, which involves lifting the entire bridge deck to change the faulty bearings beneath.

“A lot of the bearings are defective, and approximately 50 of them will be replaced across three sections”.

Kesha emphasised the importance of the Ijora Bridge as a major route leading to Apapa, home to two of Nigeria’s busiest ports, Tincan and Apapa ports.

She acknowledged the disruption the closure would cause but said that it was necessary for the safety of commuters and to prevent further deterioration.

She said that, to manage expected gridlock, motorists approaching from Ijora would be redirected through Seven Up Roundabout to reconnect to Apapa.

She said that heavy-duty vehicles would be diverted via Costain through Iganmu to access Apapa.

Kesha reassured the public that the Federal Ministry of Works had carefully planned the diversion routes and did not anticipate major issues.

She appealed to road users for understanding and cooperation.

She also said that the repairs would be time-sensitive.

According to her, the ministry has received complaints from concerned citizens who have noticed intense vibrations on the bridge.

Kesha gave the assurance that the bridge would not collapse but admitted the bridge needed urgent attention.

She said: “It won’t collapse, but it definitely needs help. If you drive on the bridge now, you will feel vibrations.

“That is because the bearings, the spring-like supports under the deck, have weakened significantly.”

This repairs, she added, would be the first major work on the Ijora Bridge since it was constructed decades ago.

She said the initial phase of the work, which would involve lifting the deck and replacing the bearings, would require full closure.

However, subsequent activities such as removing and replacing the asphalt might be done in stages, possibly on Sundays, to reduce traffic disruption, according to the official.

Kesha emphasised the importance of public awareness, noting that the Minister of Works, Sen. Dave Umahi, had mandated that any bridge closure must be widely publicised.

“We want members of the public to know that this is for their safety.

“With their cooperation, we can finish this work in time and restore the bridge to a much safer condition,” she said.

Tags: FG to close Ijora Bridge in Lagos for repairs
Share25Tweet16Send
Previous Post

‘Sinners’ tops box office with N79.5m

Next Post

Okpebholo suspends traditional ruler over kidnapping in Edo community

Next Post

Okpebholo suspends traditional ruler over kidnapping in Edo community

Aviation Ministry disputes reports on Enugu airport concession

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

ULTIMATE COMMUNICATIONS UNVEILS ‘HAMZAT’ BIOPIC FOR GRAND PREMIERE NOV 4

October 22, 2026

Nthabi Moleko, presidents, business leaders, others for ‘Invest in Africa Summit 2026’ (see venue)

October 22, 2026
Aliko Dangote, President/Chief Executive of Dangote Group (right), in a conversation with David Pilling, the Africa’s editor for Financial Times during the FT Africa Summit  in London

Pan-African Energy Distribution Network: ‘The journey has started’ – Dangote

October 22, 2026
Oluwatosin Adeola Ajayi

I’m sorry for leaking official matters, ex-DSS officer begs DG, colleagues

October 21, 2026

UCL: Carrick under intense pressure after Manchester United’s humiliating 4-1 defeat at Como

October 21, 2026

2027 Elections: Group Demands Answers From INEC Over Six Governorship Candidates

October 21, 2026

Onion Prices Hit ₦280,000 Per Bag as Tomato Costs Soar in Enugu Markets

October 21, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.