Monday, October 5, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

FG begins rehabilitation of Port Harcourt Refinery

Chidi Roberts by Chidi Roberts
March 21, 2019
in Breaking News, News
0
DPR to grant NDPR licence to operate 1000bpd modular refinery

Refinery

Share on FacebookShare on TwitterShare on Whatsapp

The Federal Government, on Thursday, kick-started the rehabilitation of Port Harcourt refineries.

Speaking at the inauguration ceremony in Port Harcourt, Dr Maikanti Baru, Group Managing Director of NNPC, said the move was part of government’s effort to achieve 90 per cent local refining capacity.

The first refinery in Port Harcourt was commissioned in 1965 to process 60,000 barrels of oil per stream day (bpsd), as well as the new plant commissioned in 1989, which has a capacity of 150,000 bpsd.

Both oil refineries possess a combined capacity of 210,000 barrels per stream day making it the “biggest oil refining company in Nigeria”

He said that the rehabilitation would be in two phases, adding that both the ENI and the original builders would participate in the process.

”We appreciate the commitment of the managers of the Port Harcourt Refineries because you know how important NNPC attach to the revamping of the refinery for it to make impact and boost local refining.

” NNPC is committed to see it come back on stream,” he said.

He said that the refineries had not undergone any Turn Around Maintanance (TAM) since 2000.

“This project is in phases, this refinery has not done TAM since 2000, so, in this particular phase, we are essentially going to open up every equipment and also review every flow system that is here.

“We also look at all the flushes ,the transmissions ,essentially, this is on thorough inspection and where infridgment is minimal, it will be fixed and we close back the system,” he said.

He noted that the Corporation had made cost effective arrange in the rehabiltation saying “Giving figure as amount to spent, i dont think it is a fair thing to do until you open up then you place”.

He said that ENI, NNPC joint venture with Agip had agreed that they would open up their warehouses of refineries to give Nigeria required equipment forthe rehabilitation.

“They will open up and take some of their equipment and we pay back later .
“That is a lot of grace instead of waiting on manufacturers, these equipment if we want to manufacture them, it will take 36 months.

“They have offered not only that they will give us a lead time but it will also be a discount because they will give us at the price they are purchased, the time value of money will also be a saving for NNPC and Nigeria, as a whole,” he noted

The GMD assured that the corporation had put on a very robust plan to be able to repair these refineries adding that it would be the cheapest and most cost effective that Nigeria would pay.

Commenting on the role of the original builders of the refineries, he said they had two roles, the first role is the documentation and the intent of the refineries.

“They will come in to open up the various equipment,they know exactly what they are looking for and ofcause if they found that some of it is eruded and some are not as expected, then it makes it very easy to say that it is outside the design and it should be replaced.

“So, the second role which is very important is that they will be able to bottleneck the refineries,by that i mean, we want 21st century refinery not 1989 refinery they built originally.

“It is going to be some level of authomation that will be introduced and latest instrumentation introduced, so that the refinery when it is up, it will be easy to operate than what it was before,” he said.

He further said that first phase of the rehabilitation process is expected to last for six month but urged the contractor to achieve it before projected time frame.

On the current operation capacity of the refinery, he said that there were several issues on the level of utilisation .

” Several units that are fundermental are not in good shape. Like the steam unit, no refinery operate with out steaming and that is a major heating element.

” This refinery is suppose to have four steam units, it reached to a point that they have only one that is working and it cannot carry the capacity of the whole refinery.

” So, Obviously, their capacity is limited and that is why we call what we are starting today rehabilitation,” he added.

Earlier in his remarks, Mr Anthonio Vella, ENI Chief Officer, Upstream, says the partnership in rehabilitating the refinery shows the longstanding partnership with Nigeria.

“In order to increase the performance of the port Harcourt refinery,ENI will share with NNPC the knowledge and expirence gained in decades of managing owned and participated refineries both in Italy and abroad,” he said

He added that the rehabilitation would be opportnuity for professional NNPC staff recently trained in Italy to show case their skills.

He noted that that rehab would be significant upgrade, with equipment and machines beign opened for inspection.

He urged workers to ensure they achieve zero accident while working.

” With the commitment of all parties invovled , we are sure that NNPC will be able to celebrate the revamping of the refinery, restored to its full capacity in time , on schedule and in full safety,” he said.

Tags: FG begins rehabilitation of Port Harcourt Refinery
Share25Tweet16Send
Previous Post

Sokoto re-run: Army begins show of force, warns against violence

Next Post

Aare Gani Adams buries father, says ‘my dad an epitome of humility’

Next Post
Gani Adams: Annulment of June 12 election 'Nigeria’s most defining moment’

Aare Gani Adams buries father, says 'my dad an epitome of humility'

NPFL

NPFL: Rangers pip Sunshine Stars 1-0, climb to seventh position in Group A

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

ICPC, AGF Ask Court to Dismiss El-Rufai’s N1bn Rights Suit

October 5, 2026

Tinubu: Army Activates New Formations in Zamfara, Kebbi, Oyo and Osun

October 5, 2026

Extreme Heat Threatens Pregnancy and Newborn Health, UN Climate Chief Warns

October 5, 2026

Super Eagles Hit by Injuries, Club Restrictions Ahead of Russia Friendly

October 5, 2026

Buruku Boat Accident: 125 Rescued as Divers Search for Missing Passengers

October 5, 2026

Ogun PDP Deputy Governorship Candidate, Sowunmi-Kolapo, holds reception in honour of retired traffic warden, Anifa Bello (see pix)

October 5, 2026

TAFTA’s Creator HQ Equips Female Digital Creators With Skills, Tools and Opportunities to Build Sustainable Creative Careers (see pix)

October 5, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.