Wednesday, April 29, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

Fashola: Vehicles parked at construction sites on highways will be impounded

Chidi Roberts by Chidi Roberts
March 21, 2020
in Breaking News, News
0

The Minister of Works and Housing, Mr Babatunde  Fashola (SAN), on Friday, directed that all vehicles parked at construction sites of highway projects should be impounded.
Fashola said this in a statement in Abuja after his return from an inspection tour of the highway projects in Port- Harcout, Rivers State.
According to him, the Federal Government roads are not for parking lot.
He said that the highways were not parking lot, so people who wanted to do business must create their own parking lots as well.
He said that the on-going expansion and upgrading work on the Port Harcourt– Enugu and the Aba – Port Harcourt Expressways was on course.
“The 9km road from Eleme Junction to the Imo River and 4km of the road to the railway crossing in Aba towards Port Harcourt sections of the road are being expanded and upgraded from the four existing lanes to eight lanes.
“This is to accommodate current and future traffic volumes and ease some level of intolerable discomfort especially during the rainy season.
“The road would link the five states in the Southeast Geopolitical Zone of the country.
“The highway has a total length of 41.4km starting from Aba Rail Crossing Bridge within Aba township in Abia  and will finally terminate at Eleme  Junction  Flyover  in  Port Harcourt, Rivers.’’
Fashola  commended the initiative of the construction company, China Civil Engineering Construction Corporation Nigeria Ltd as it planned to focus on the first four  lanes.
He said that the company planned to  finish that and put them  to use before the  reconstruction of the other four  lanes to reduce the long time spent in traffic by commuters and the community.
“If people have two uninterrupted lanes, traffic may be slow but it will move, and therefore we can concentrate on finishing the remaining lanes.
“When we finish both , then we can have the full compliment of the eight lane highway.
“Our  plan is to make this year better than last year and ultimately by next year, there will be no rainy season challenges because, we should have come out fully from this,”he added.
The minister also disclosed that similar construction work had commenced at the Enugu and Okigwe axis of the highway project by different contractors to provide seamless travelling experience.
He used the opportunity to urge local and state governments to mobilise their people to be alive to their civic responsibilities and cooperation, pointing out that community and personal hygiene were crucial  in this crisis of Coronavirus (COVID-19).
The Federal Controller of Works Rivers, Mr Johnson Fadire, who conducted the minister and his team round the on-going road construction project said the inspection by the minister was timely.
Fadire said the ministry would “do the needful’ to make sure the road was completed and delivered at the right time.
He commended traditional rulers who prevailed on their subjects whose properties were demolished for the construction of the highway for agreeing to accept an initial payment of 50 per cent for compensation on their demolished properties.
Earlier, Mr Zou Xiaomei, Project Manager of CCECC Nigeria Ltd, one of the contractors handling section IV of the project in Rivers, said although there were initial challenges but they had been sorted out.

Tags: Fashola: Vehicles parked at construction sites on highways will be impounded
Previous Post

ICPC arrests Obono-Obla

Next Post

APC crisis: Appeal Court adjourns Oshiomhole’s suspension appeal indefinitely

Next Post
APC crisis: Appeal Court adjourns Oshiomhole’s suspension appeal indefinitely

APC crisis: Appeal Court adjourns Oshiomhole’s suspension appeal indefinitely

COVID-19: NCDC says asymptomatic patients 'only infectious within 14 days'

COVID-19: Hoteliers decry low patronage, chloroquine drug to undergo clinical trial, Oyo Govt orders closure of schools, FUTA, BUK, UNILAG suspend academic activities, WAEC postpones exam, Don prescribes prayer, UN Chief tests positive

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

Alt="Court"

Court Stops INEC from Recognising ADC Congresses Led by David Mark

April 29, 2026

Court Closes Defence in Mompha’s N6bn Money Laundering Trial

April 28, 2026

Court Fixes May 8 to Hear Suit Challenging Jonathan’s 2027 Eligibility

April 28, 2026

Lagos Solar Policy Sparks Mixed Reactions Among Residents

April 28, 2026
Naira

NLC: ₦1m monthly salary worthless without stable Naira

April 28, 2026

IPAC Warns Rising Nomination Fees Threaten Nigeria’s Democracy

April 28, 2026

World Bank: Middle East war to spark biggest energy price surge in four years

April 28, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.