Thursday, October 22, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

Emergency at Eko Bridge: Dredger destroys pier cap, rods; Umahi expresses concern

Femi Adewale by Femi Adewale
April 5, 2025
in Breaking News
0
Share on FacebookShare on TwitterShare on Whatsapp

The Federal Government, on Saturday, announced an emergency situation at the Eko Bridge, Lagos, that almost warranted a closure.

The Minister of Works, Sen. Dave Umahi, made the announcement during an inspection tour of the bridge.

“We had a very terrible situation at Eko Bridge with one of the pier caps totally damaged, and again, I was only told last night”.

According to the minister, a dredger hit the pier cap and destroyed the pier and many rods.

“Pier caps are to bridges what the legs are to human beings.

“What is holding that section are only rods. Some of the rods were damaged also.

“I immediately directed divers to be deployed,” he said.

He said that he also got into a smaller boat and went under the water to know the level of damage below the water.

According to the minister, a whole pier was totally removed by the accident.

“I was going to announce shutting down of the bridge but I have looked at it and there is something we can do, though very delicate, to restore it.

“There will be no need of shutting down but it is an emergency situation,” he said.

He said that he had directed the contractor handling the bridge repair on what to do.

The minister, who also inspected the Third Mainland Bridge, expressed satisfaction at the progress of work there.

“We have inspected the Third Mainland Bridge, and Carter Bridge, both being handled by Julius Berger, and we are satisfied with the work.

“I can say that the work on Third Mainland Bridge is about 50 per cent completed, and that of Carter Bridge, about 70 per cent completed.”

He said that the slab on the Third Mainland Bridge had deflection compelling its closure against articulated vehicles.

Umahi said that Julius Berger insisted that there was a new design to tackle that and would want designers from the Federal Ministry of Works to go with its team to Germany to look at the new design.

“We will nominate four people who will go to Germany and look at the new design method and then, we will approve,” he added.

Earlier, Mr Ghassan Kaadi, the Project Coordinator for Build Well, the contractor handling the Eko Bridge rehabilitation project, said that the project was 75 per cent completed.

“All the asphalt has been done. All the bearing has been changed.

“We are changing, right now, the remaining of the expansion joint.

“We have 1,000 meters of expansion joint. We are at 700 right now.

“The solar light is almost 90 per cent done,” he said.

He added that 2,500 metres of the 6,000 concrete handrail had been done.

Mr Thomas Christ, Regional Manager, West, Julius Berger Plc., the contractor handling Third Mainland Bridge and Carter Bridge repairs, said that the company was aware of how critical the bridges were in connecting motorists and commuters from Lagos Island to Lagos Mainland.

“That is why we are working here with the best engineers from the Federal Ministry of Works.

“We did some investigations under water and above the water on the quality and the structural integrity of the bridges.”

He said that Julius Berger was working with engineers from the Federal Ministry of Works to find out the best solution to the bridges.

He said that the company was intensifying efforts to finish the works as fast as possible and make the bridges sustainable.

Tags: Emergency at Eko Bridge: Dredger destroys pier cap rods; Umahi expresses concern
Share25Tweet16Send
Previous Post

Revealed! Over 300 military officers, lecturers, ambassadors, businessmen paid terrorists millions of Naira to release General Tsiga

Next Post

Moughalu wins LP guber ticket in Anambra

Next Post
Moughalu

Moughalu wins LP guber ticket in Anambra

Why I want Youth Corps members to serve for two years - Education Minister

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

Oluwatosin Adeola Ajayi

I’m sorry for leaking official matters, ex-DSS officer begs DG, colleagues

October 21, 2026

UCL: Carrick under intense pressure after Manchester United’s humiliating 4-1 defeat at Como

October 21, 2026

2027 Elections: Group Demands Answers From INEC Over Six Governorship Candidates

October 21, 2026

Onion Prices Hit ₦280,000 Per Bag as Tomato Costs Soar in Enugu Markets

October 21, 2026

Senate Mourns Emmanuel Uduaghan, Hails Former Delta Governor’s Role in Niger Delta Peace

October 21, 2026
From left: District Polio Advisor, District 9127, Olajumoke Ekeinde;  District Polio Plus Committee Chair, Mariam Ahmed; Past District Governor, PGD Felix Obadan;  Chair, End Polio Rotary Club Abuja Metro, Dr. Gladys George;  President of the Rotary Club of Abuja Metro, Engr. Michael O. Oluwagbemi; District Governor 9127, Engr. Sikiru Adetona Owonikoko and Assistant Governor, Rotary Club Wuse Central, Zainab Omowunmi Owonikoko, during the unveiling of End Polio BillBoards, at the Central Business District (CBD) in Abuja.

War against Polio winnable, says Rotary Governor

October 21, 2026

Plateau Insecurity: Youth Coalition Backs DSS, Police Operations, Demands Probe of Bias Claims

October 21, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.