Thursday, July 23, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

Egbin Power Plant to deploy 1,320 megawatts to National Grid

Femi Adewale by Femi Adewale
February 4, 2019
in Breaking News, News
0

The Egbin Power Plant, one of the subsidiaries of Sahara Power Group, says it will deploy 1,320 Megawatts (MW) of electricity to the National Grid (NG) before February ending.
Its Group Managing Director (GMD), Mr Kola Adesina, made the disclosure on Monday at the induction of 39 Young Engineers of the company in Lagos.
They will undergo the Graduate Engineering Programme (GEP) at the National Power Training Institute of Nigeria (NAPTIN).
Sahara Power Group comprises the formerly state-owned Egbin Power Plc., Ikeja Electricity Distribution Company and First Independent Power Ltd., Rivers State.
According to Adesina, at present the plant is delivering 524MW to the National Grid.
“As at today, Egbin Power Plant can generate 880MW of electricity, but the limitation of evacuation is what is restricting it to 524MW.
“But as a power plant, the company will provide up to 1,320MW by February ending,” he said.
The group managing director said that the inductees would undergo the training for six months and two weeks.
“The GEP is a crucial aspect of our strategy as a global business with focus on innovation and human capital development.
“We are committed to expanding the depth of our training programmes through ongoing investment and collaboration with regional and global organisations,” he said.
Adesina said that the inductees would have the opportunity of learning from some of the continent’s best engineering professionals at Egbin Power and First Independent Power Ltd.
“We are setting the tone for a future where our people will become power experts with global influence, providing smart solutions to the power needs in Africa and beyond.
“It all starts from the GEP; we are delighted to have this batch of engineers on board. Sahara Power’s vision of lighting up Africa that  will be driven by the best possible human capital.
“Most of the technical training sessions will be held at Egbin Power Plc and First Independent Power Ltd.,” he said.
The NAPTIN’s acting Director-General, Mr Ahmed Nagode, said that the power sector needed consistent training activities to address the dearth of human capital in the sector.
Nagode said it was imperative for the sector to bridge the knowledge gap by investing in its people through sustained collaboration between the public and private sector.
“A robust human capital is required to transform the power sector to achieving higher efficiency, reliability and productivity.
“As always, NAPTIN is delighted to continue its collaboration with Sahara Power Group on this project.
“We have through the Sahara Power group graduates engineering programme, produced excellent engineers that are already bringing innovative solutions to processes in the sector.
“I congratulate the successful inductees, and I am confident that the future is bright for all of you and for the entire power sector,” he said.

Tags: Egbin Power Plant to deploy 1320 megawatts to National Grid
Previous Post

Three suspected kidnappers killed in Taraba

Next Post

Obanikoro: It is painful to give evidence against Fayose

Next Post
We solicited patronage from Fayose, witness tells court

Obanikoro: It is painful to give evidence against Fayose

Police plan one-million-man march against cultism

Adamu Mohammed: Policing standards, practices must change

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

Police

Ekiti Govt: We are not involved in arrest of Abimbola Olawunmi

July 23, 2026

Court Rejects Sowore’s Bid to Tender Uncertified Document in Defamation Trial

July 22, 2026

Nigerian Stock Market Loses N801bn as Profit-Taking Ends Three-Day Rally

July 22, 2026

INEC Urges Ondo Residents to Complete Voter Registration Before July 26 Deadline

July 22, 2026

NAFDAC Begins Nationwide Crackdown on Banned Sachet Alcohol, Small PET Bottles

July 22, 2026

APC Rejects Atiku’s Claim That ₦12.8tn Service-Wide Vote Will Fund Tinubu’s 2027 Campaign

July 22, 2026

Reps Urge FG to Fund Nigerian Drone Manufacturers to Strengthen Security Operations

July 22, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.