Friday, May 22, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

British high-speed HS2 trains to run on zero-carbon electricity

Freedom Reporter by Freedom Reporter
January 11, 2022
in Breaking News, News
0

Britain’s new high-speed HS2 trains would be powered using zero-carbon electricity to cut greenhouse gas emissions, the government said in London.

Andrew Stephenson, the Minister responsible for the high-speed railway, announced the commitment alongside a series of new measures to reduce the project’s carbon footprint.

Other pledges include eliminating diesel from at least one HS2 construction site in 2022 and from all sites by 2029.

There is a new target for carbon emissions from the steel and concrete used to build the railway to be halved, compared with 2021 levels by 2030.

Zero-carbon running of HS2 trains from day-one means they would only use electricity generated from sources such as wind, nuclear and solar, rather than fossil fuels.

Stephenson said: “We know that the climate crisis demands urgent action, and these commitments from HS2 are vital steps towards achieving cleaner UK travel.

“HS2 is a once-in-a-lifetime investment and we want to ensure the country’s biggest infrastructure project supporting thousands of jobs and businesses is underpinned by the government’s ambitions for a greener transport and construction future.”

Britain has pledged to bring all greenhouse gas emissions to net-zero by 2050.

HS2 Ltd. Chief Executive Mark Thurston said: “HS2 Ltd. is completely committed to reducing our carbon emissions as we design, build and operate the new railway.

“We’ve ensured that tackling climate change is an essential feature of all areas of our work in design, in early works and throughout major construction, allowing the project to build towards net-zero from 2035.

“The new targets announced today demonstrate the significant role HS2 will play in addressing climate challenge by providing a low-carbon, long-distance transport solution and leading the construction sector to drive down carbon emissions.”

The first phase of HS2 from London to Birmingham is scheduled to open between 2029-2033.

Kathryn Brown, Director of Climate action for The Wildlife Trusts, said: “It is good to hear positive ambitions for HS2 because, so far, the construction has caused only damage and destruction of nature.

“Promising low-carbon travel is vital, but not if that comes at the expense of the natural world.

“We can’t build our way out of the climate crisis, and the government has made it clear that restoring nature and natural processes is needed at an unprecedented scale.

“When it comes to the nature emergency, so far, HS2 has only made things worse.”

Tags: British high-speed HS2 trains to run on zero-carbon electricity
Previous Post

U.S. surgeons transplant pig’s heart into adult human ‘first time’

Next Post

Orji Kalu renews call for postponement of APC national convention

Next Post
Kalu

Orji Kalu renews call for postponement of APC national convention

Governors better placed to fight insecurity, says Kalu

Alleged N7.1bn fraud:  Kalu asks court to expunge name from charge

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

Tinubu

Tinubu: No plan to rename Nigeria, abolish Sharia Law

May 21, 2026
Haske

Adamawa 2027: Haske outpaces rivals with commanding early lead in APC Primary

May 21, 2026

Mr Eazi, Otedola’s daughter Temi expecting first child

May 21, 2026
Court

Man sues ex-wife over refusal to leave after divorce

May 21, 2026
INEC

Court voids INEC timetable for conduct of 2027 polls

May 21, 2026

Obasa warns dissidents as Agege affirms Hamzat as APC governorship candidate

May 21, 2026
11 soldiers killed in Benue

Attahiru: Remembering a patriot five years on – Niran Adedokun

May 21, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.