Sunday, April 26, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

Atiku to Tinubu: Reveal cost of Lagos-Calabar Highway Project

Robby Akeju by Robby Akeju
April 10, 2024
in Breaking News
0
Tinubu and Atiku

Tinubu and Atiku

*Queries how FG got the design, right of way in seven months

The Presidential candidate of the Peoples Democratic Party (PDP) in the last election, Atiku Abubakar, has dared President Bola Ahmed Tinubu to disclose the full cost of the Lagos-Calabar highway project.

Atiku said in a statement on Tuesday that the Tinubu administration could not continue to keep silent on how much of public funds would be spent on the project at a time Nigeria was still facing dire economic challenges.

The former Vice President had through Paul Ibe, his Media Adviser (and not Media Assistant as erroneously stated by Bayo Onanuga) questioned the Tinubu administration’s decision to award the contract to Gilbert Chagoury’s Hitech without a competitive bidding.

He had also wondered why the Tinubu administration released N1.06tn for the pilot phase or 6% of the project, which begins at Eko Atlantic and is expected to terminate at the Lekki Deep Sea Port.

The statement read in part, “The Tinubu administration cannot continue to respond to public inquiry with insults. They must come clean on this project because Nigerians deserve to know the truth. I, therefore, present six posers to the administration.

1. How much is the total cost of the Lagos-Calabar coastal highway?
2. Why is the project being funded by the Nigerian government despite being a PPP?
3. Why is the project taking off from Chagoury’s Eko Atlantic?
4. Why is N1.06tn being spent on the pilot phase, which is just 47km?
5. Why did the N1.06tn not get the approval of the National Assembly?
6. Why wasn’t there a competitive bidding for the project?”
7. Finally, how did the Tinubu administration get the design as well as the right of way in just seven months, since it claims the past administration of Goodluck Jonathan and Muhammadu Buhari never touched the project?

Atiku asked the Tinubu administration to, in the spirit of the Freedom of Information Act, respond to the questions line by line instead of taking the mundane and jejune route of “insulting their way out of every inquiry”.

Tags: Atiku to Tinubu: Reveal cost of Lagos-Calabar Highway Project
Previous Post

Pushed to the wall over State Police, by Eric Teniola

Next Post

UBA introduces First of its Kind scan to resolve Complaint Portal

Next Post
Alawuba

UBA introduces First of its Kind scan to resolve Complaint Portal

Lagos

Lagos Govt seals four buildings in Ikoyi for flouting Regulations (see pix)

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

UBA

UBA Plc delivers core income growth in Q1 2026

April 25, 2026

2027: Atiku, Makinde, Mark, Turaki, Obi, Kwankwaso, Aregbesola, Amaechi, others meet in Ibadan, vow to field one presidential candidate to challenge APC

April 25, 2026

Barcelona extend LaLiga lead with 2-0 win over Getafe

April 25, 2026

EPL: Scrappy Arsenal edge out Newcastle 1-0 to reclaim top spot

April 25, 2026
Haske

Yola agog as Abdulrahman Haske declares for Adamawa governorship race + pix

April 25, 2026

GRIT TO GLORY: OLADITI EMERGES AS NUPENG PRESIDENT IN A DEFINING MOMENT

April 25, 2026

Gunmen Kill Traditional Ruler, Wife, Two Others in Benue Community

April 25, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.