Sunday, October 4, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

Amaechi takes delivery of two standard gauge locomotives from China

Robby Akeju by Robby Akeju
July 27, 2017
in News
0
train
Share on FacebookShare on TwitterShare on Whatsapp

Minister of Transportation, Mr Rotimi Amaechi, on Thursday, took delivery of two double-end-drivers’-cabin standard gauge locomotive engines from the Peoples Republic of China.
The minister, who was represented by the Managing Director of the Nigeria Railway Corporation (NRC), Mr Fidet Okhiria, said that 10 more locomotives were expected to arrive the country by September.
Okhiria was on hand to take delivery of the two locomotives, which were discharged at the ENL Terminal of the Lagos Port Complex (LPC).
The Managing Director said that the two locomotives were part of 20 locomotive engines expected to arrive the country for the commencement of standard gauge rail operations in Nigeria.
“This two locomotives are specifically designed for passenger train movement.
“The locomotives have inbuilt power supply and this is unprecedented.
“It is designed for 150km per hour rail services and it is a double-end drivers’ cabin.
“What this means is that on both ends of the locomotive, there is a driver’s cabin. What we used to have is a locomotive with only one driver’s cabin on one side,’’ he said.
According to him: “10 locomotives that we ordered in April, the company manufacturing them has asked that we come for a factory acceptance test.’’
Okhiria said that hopefully, the 10 coaches would arrive the country by September.
“With these two new additions, we intend to increase our return trips because the new locomotives would be running at a speed of 130km per hour, as against the 90km per hour we are currently doing.
“The locomotives will be put to use for the Nigerian standard gauge rail project, although for now, we are only doing the Kaduna-Abuja standard gauge rail,’’ Okhiria added.
Amaechi had said on Monday, July 10, in Lagos that the Federal Government would ensure the completion of the ongoing Lagos-Ibadan standard gauge rail service by Dec. 2018.
Amaechi gave the assurance while inspecting the ongoing rail projects at the Ijoko community area of Ogun State.
The minister said that the Federal Government was making all efforts to ensure the completion of the project on schedule.

Tags: train
Share25Tweet16Send
Previous Post

Naira loses 0.5 points against dollar

Next Post

Senate passes Nigerian Financial Intelligence Agency Bill

Next Post
senate, aisha, cbn

Senate passes Nigerian Financial Intelligence Agency Bill

Five UNIMAID workers killed, four others missing in Tuesday insurgents’ attack

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

Wunti warns Africa against repeating Oil mistake with Lithium, Cobalt, Rare Earths

October 3, 2026

FG: Nigeria’s Annual Wheat Output Rises From 120,000 to 420,000 Tonnes

October 3, 2026

Moniepoint CEO Tosin Eniolorunda Named Among TIME100 Next 2026 Leaders

October 3, 2026

NYSC Abduction: IGP Sends DIG Operations to Imo to Lead Rescue Effort

October 3, 2026

Yorubaland Islamic Council Declares Support for Tinubu, Hamzat Ahead of 2027

October 3, 2026

Why Nigerian Airlines Fail: Expert Identifies Poor Management, High Costs and Training Gaps

October 3, 2026

Soludo Swears In 21 Anambra LG Chairmen, Tasks Them on Service Delivery

October 3, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.