Thursday, April 23, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

AG Dangote completes Apapa-Wharf concrete road, begins street lights installation

Femi Adewale by Femi Adewale
September 25, 2018
in Breaking News, News
0

Work on the Apapa-Wharf Concrete Road has been completed, according to a senior engineer
with the AG Dangote Construction Company Ltd, contractors handling the project.
With the completion of the road, gridlock on the Apapa Road is expected to ease.
The four-kilometre dual carriageway, built with cement, has a median, walkways and side barriers on the various sections painted in black and white.
Big drainage on both sides has also been completed while street lights have also been erected on Sections one and four of the project.
Interlocking stones are still being laid on about three-quarter of the service lane of out-bound Apapa dual
carriageway.
Section one of the project is 520 metres, section two is 450 metres, three is 380 while section four is 650 metres.
The engineer, who did not want his name mentioned, said the concrete road needed to undergo “curing” for a period of time before
the road could be opened to traffic, adding that the various sections had different curing periods.
Curing process is the number of days required for concrete to gain enough strength for durability.
He said: “We have completed concrete works on all the four sections. We have also finished work on this Eleganza Roundabout and we are linking the rigid pavement to connecting roads.
“We are only waiting for some sections to `cure’. Curing takes 28 days, some sections have cured but this Eleganza roundabout
and some other small portions are still undergoing curing.
“ Concrete on the road is 100 per cent completed and we have started erecting the street lights.
“Section four is the longest of about 650 metres and it has cured completely, all other portions have cured except this roundabout
area.
“We are screeding and painting the median barriers and sidewalks at the same time. Screeding is like applying POP or dressing
on a surface to make it smooth for painting.
“This project would have been completed but we did not expect the amount of rainfall that came in this month of September.
“Although the rain is not an excuse, but it is disturbing us.”
The Minister of Power, Works and Housing, Mr Babatunde Fashola, had on June 17, 2017 signed a N4.34 billion Memorandum
of Understanding (MoU) with AG Dangote Construction Company Ltd and some other stakeholders for reconstructing the
Apapa-Wharf Road.
The project is being funded by AG Dangote Construction Company Ltd, the Nigerian Ports Authority (NPA) and Flour
Mills of Nigeria Plc.

Tags: apapa roaddangote
Previous Post

Employment Trust Fund: 15,000 jobs created in two years in Lagos

Next Post

Buratai expresses concern over setback in operations

Next Post
Masari to military: Use superior fire power to deal with bandits

Buratai expresses concern over setback in operations

APC consensus candidates emerge for Ekiti Assembly

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

Dangote, Museveni, Ruto, Zubairu meet in Kenya

April 23, 2026

Dangote Refinery exports 1.1bn litres of aviation fuel to Europe, supplies 95% of Nigeria’s Jet A1 – AON

April 23, 2026

Okpebholo Backs Tinubu’s Re-election as City Boy Movement Visits Edo

April 23, 2026

Poor Network? NCC Mandates Airtime Compensation for Subscribers

April 23, 2026

Obudu Cargo Airport Reaches 90% Completion – Cross River Govt

April 23, 2026

UBA GMAP: The Ultimate Career Gamechanger Gen Zs Wouldn’t Stop Talking About

April 23, 2026

Trump to give Iran days to agree on unified proposal

April 23, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.