Wednesday, June 3, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

96 companies bid for rehabilitation of NNPC’s downstream infrastructure

Ola Simeon by Ola Simeon
January 14, 2021
in Breaking News, News
0
IATF2021: Afreximbank, NNPC sign $1.04bn facility for oil exploration

NNPC

No fewer than 96 companies have indicated interest in the rehabilitation of the Nigerian National Petroleum Corporation’s (NNPC) downstream infrastructure.

The public opening of the bid was held virtually in Abuja, on Thursday.

The Managing Director of the Nigerian Pipelines and Storage Company (NPSC), Mrs Ada Oyetunde, said that the exercise was in conformity with the mandate of the Federal Government to prioritise the rehabilitation of critical downstream infrastructure across the country.

She listed the facilities that would be rehabilitated by successful bidders to include critical pipelines for crude oil supply to the refineries and evacuation of refined products, depots, and terminals.

Oyetunde said that the objective was to get them ready to support the refineries when they become operational after their rehabilitation.

“An open tender for pre-qualification of interested companies was published in August 2020 in the national dailies, for the rehabilitation of NNPC downstream critical pipelines and associated depots and terminal infrastructure through Finance Build Operate and Transfer (BOT) to cover the 4 lots.

“The four lots are Lot 1: Port Harcourt Refinery related infrastructure, Lot 2: Warri Refinery related infrastructure, Lot 3: Kaduna Refinery related infrastructure and Lot 4: System 2B related infrastructure,” she said.

The NPSC boss said that the BOT arrangement would provide a reliable pipeline network and automated storage facilities for effective crude feed, product storage and evacuation from the nation’s refineries post-revamp through an open access model.

This, she added, would charge market reflective prices and tariffs to recover the investment.

Earlier, the Group General Manager, Supply Chain Management, Mrs Aisha Katagum, commended the Infrastructure Concession Regulatory Commission (ICRC), and the Bureau of Public Procurement (BPP) for providing guidance for the project.

She assured the bidding firms of a fair, equitable and transparent selection process.

Observers at the public bid opening exercise were representatives of the ICRC, BPP, the Nigeria Extractive Industries Transparency Initiative and Civil Liberties Organisations. 

Tags: 96 companies bid for rehabilitation of NNPC’s downstream infrastructure
Previous Post

Pope Francis, ex-Pope Benedict receive COVID-19 vaccine

Next Post

FG: January 18 schools resumption date stands

Next Post

FG: January 18 schools resumption date stands

Accident

Two police Inspectors, ambulance driver die in Kogi accident

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

Eric Teniola

Boycott the Boycottables, by Eric Teniola

June 2, 2026

Insecurity: CAN declares three-day national mourning, designates June 14 as ‘Black Sunday’

June 2, 2026
Sule Lamido

Alleged N1.35bn fraud: Sule Lamido, EFCC disagree over subpoenaed witness

June 2, 2026

Trader stabbed to death in dawn attack

June 2, 2026
Police

Security guard absconds with employer’s two sons

June 2, 2026
Insecurity: Presidency salutes CAN over peaceful protest

Adeboye to Service Chiefs: End terrorism within 90 days or quit; as RCCG defends GO’s integrity

June 2, 2026
Jimoh Ibrahim

Jimoh Ibrahim elected Chairman, Committee on Budget and Administration of UN; thanks Tinubu

June 2, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.