Monday, June 1, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

40 per cent of production cost goes into power generation, laments MAN

Ola Simeon by Ola Simeon
December 18, 2015
in Breaking News, Business, Energy, News
0

Manufacturers Association of Nigeria (MAN) has said that because of insufficient power supply, over 40 per cent of production cost in Nigeria goes to electricity generation by manufacturers.

Mr Regard Odiah, a member of MAN and Chairman, Technical Committee on Operationalisation of Micro-Grid for Industrial Initiative, made the statement in Abuja when he presented the report of the committee to NERC.

The committee was inaugurated two weeks ago by NERC and mandated to take a critical look at the energy laws in Nigeria.

The committee was also required to come up with implementable policies and regulations that would address the numerous power challenges facing industries, especially the manufacturing sector.

“Over 40 per cent of our production cost goes into provision of electricity supply for our manufacturing.

“Also when other infrastructural deficiencies are added, Nigeria becomes one of the most expensive countries in the world to set up a business venture,’’ he said.

Odiah said the combined power generation capacity of MAN nationwide was 15,000mw while the maximum generation from the central/national grid was less than 5,000mw and unreliable.

According to him, this leaves a huge gap of power insufficiency to the sector.

He listed time and fund as the two factors that posed challenges to the committee in producing the report.

Earlier, the Chairman of NERC, Dr Sam Amadi, expressed happiness and appreciation to the committee for preparing the report and coming out with the report on time.

He assured the committee that the report would be submitted to the Minister of Power, Works and Housing, Mr Babatunde Fashola, for approval.

Mr Frank Jacob, President of MAN, said that there were 28 industrial clusters in Nigeria, adding that the association spent N73 million every month on power generation to manufacture goods in the clusters.

Jacob explained that with adequate supply of electricity, the association would manufacture more goods and the economy would be better and people enjoy improved standard of living.

Tags: man
Previous Post

NUPENG: Apapa gridlock will continue until petrol is available nationwide

Next Post

Nigerian judiciary needs complete overhaul, says CJN

Next Post
court

Nigerian judiciary needs complete overhaul, says CJN

MTN cancels $300m stake sale in Mascom Wireless Botswana

NCC files criminal charges against MTN over alleged copyright infringement

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

NNPC

NNPC Ltd. records N481bn profit

May 31, 2026

Expert canvasses Mobile Healthcare Outreach Programme for Esanland

May 31, 2026

Oriire abduction: Tinubu approves 1,000 forest guards, deploys special rescue team

May 31, 2026
Hamzat and Sanwo-Olu

Sycophants at work: RE-HAMZAT AND THE FUTURE OF LAGOS BY BOLAJI SANUSI

May 31, 2026
Wase

Wase backs Tinubu’s reforms, lauds Mutfwang on projects

May 31, 2026

2027: Many governors seeking Senate seats to retain state control — Don

May 31, 2026

Oriire abduction: Makinde meets victims’ families, as terrorists strike again in Katsina

May 31, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.