Sunday, August 23, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

3rd Mainland Bridge to be shut for four days

Femi Adewale by Femi Adewale
August 19, 2018
in Breaking News, News
0
FG to shut down Third Mainland Bridge for another 72 hours

Third Mainland Bridge

 
The Lagos State Government has said that the 3rd Mainland Bridge will be temporarily shut down for four days starting from midnight of August 23 to midnight of August 26, 2018 for Investigative Maintenance Test to be carried out.
Commissioner for Works and Infrastructure, Mr Ade Akinsanya, who disclosed this in a statement, said the decision was taken after due consultation with the Federal Ministry of Power, Works and Housing.
The four-day closure, according to Akinsanya, will enable the contractors assess the true state of the bridge after which works would commence by the end of the year or early in 2019.
It would be recalled that the Federal Government had earlier announced plans to shut the bridge in July, but had to be shelved after due consultation with the State Government and wide deliberations with other stakeholders, who expressed concern about the indiscriminate parking of articulated vehicles on other alternative routes which would have adversely affected traffic.
 
Subsequently, a Joint Task Force set up to remove the articulated vehicles from the highway was able to achieve tremendous success.
 
Justifying the need for the closure, Akinsanya said: “The 3rd Mainland Bridge which was opened about 30 years ago by the then military government has had haphazard maintenance and repairs in the past which the present Federal Government is committed to correct by carrying out proper and continuous maintenance and repairs on it.”
 
Consequently, the State Government appealed for the cooperation, support and understanding of all motorists and residents, advising them to minimize non-essential travel and movements during the four-day closure.
 
Besides, Akinsanya said all traffic management agencies including the Lagos State Traffic Management Authority (LASTMA), Federal Road Safety Corps (FRSC) and the Police, among others, have been mandated to ensure smooth flow of traffic on all the other alternative roads and traffic corridor across the metropolis to ensure free flow of traffic.

Tags: Third mainland bridge
Previous Post

NUT gives 21-day ultimatum to Edo govt over poor education funding

Next Post

APC, PDP bicker over suspended Rivers poll

Next Post
INEC worried over violence during parties’ primaries

APC, PDP bicker over suspended Rivers poll

aguero

Aguero nets 13th hat-trick as free-scoring City rout Huddersfield

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2026/04/VID-20260408-WA0025.mp4
https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

Akintunde emerges NIJ alumni National President, Kayode-Adedeji is Secretary

August 23, 2026
Lagos Calabar Coastal Highway

WHY LAGOS-CALABAR COASTAL HIGHWAY PROJECT IS BEYOND 2027 ELECTIONS

August 23, 2026

The Presidential Noah’s Ark, by Babafemi Ojudu

August 23, 2026
Uzodimma and Tinubu

Uzodimma hands over 30 campaign buses to Imo APC Chairmen, others; tasks Party on 100% Tinubu victory

August 23, 2026
Adeleke and Tinubu

Osun Polls: The days after and implications for 2027, by Tunde Rahman

August 22, 2026
Screenshot

Gospel Singer Asu Ekiye: My wife initiated divorce proceedings leading to dissolution of our 28-year marriage

August 22, 2026

Four members of same family, dog die after eating Amala

August 22, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.