Friday, April 3, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

Power generation: Egbin station hits 1,100 megawatts output

Robby Akeju by Robby Akeju
November 25, 2015
in Breaking News, Business, Energy, News
0

Power generation from Egbin power plant in Lagos State has increased to 1,100 megawatts from 813 megawatts in October.
A source at the plant said in Lagos on Wednesday that this followed improved gas supply to the station.

The plant, the nation’s biggest power generating station, has capacity to contribute about 1,320 megawatts to the national grid.

The source said that with the new power generation level, the station was accounting for almost one-third of the current improvement in power supply across the country.

It said that the recent increase in gas supply was due to “ramp-up” of Egbin’s capacity through continuous investment by its new owners.
The Sahara Power Group and Korea Electric Power Corporation (KEPCO) are the new owners of the station.

According to the source, new the owners have injected N50 billion into the company post privatisation in addition to high level innovation, professionalism, human capital and new technology.

The official promised that the company would be operating at its installed capacity after the ongoing rehabilitation.

The source said that the management was also working to double the power generation capacity from 1,320 megawatts to 2,640 megawatts by 2018.

Meanwhile, the Transmission Company Nigeria (TCN), on Tuesday said that Nigeria’s power generation had hit a new peak of 4,883 megawatts.

This was contained in a statement signed by Mr Clement Ezeolisha, its Assistant General Manager (Public Affairs).

He disclosed that the new level was achieved at 21.15 hours on Monday, Nov. 23.

“TCN is pleased to announce the achievement of a new record peak generation of 4,883.9 megawatts and the highest maximum daily energy delivery of 106,288.48 MWH,’’ the statement said.

The company assured Nigerians that it would continue to improve on its network capacity to deliver quality power to the distribution companies.

Tags: egbin
Previous Post

Girl whips kid brother to death for refusing to run errand

Next Post

LIRS shuts five firms over non-remittance of N55.45m tax

Next Post
lirs

LIRS shuts five firms over non-remittance of N55.45m tax

Judge remands LASU student, five suspected cultists for shooting man in private part

LASU: Students’ union postpones election indefinitely

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

Tinubu and Yilwatda

Yilwatda: Plateau must never bleed again

April 3, 2026

WELA Requests Update On Alleged Sexual Violence in Delta, Calls for Ban on ‘Raping Festival’

April 3, 2026
Amupitan

INEC dismisses calls for Chairman’s removal, clarifies misconception over voter revalidation

April 2, 2026

APC to ADC: You are the architect of your misfortune

April 2, 2026

Adelabu’s Power Lines as Laundry Lines – Azu Ishiekwene

April 2, 2026

Why 57 properties linked to Malami should be permanently forfeited to FG – EFCC

April 2, 2026

ADC: Tinubu wants to be the only presidential candidate in 2027

April 2, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.