Friday, April 3, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

Gully erosion in Anambra shocks works minister

Gbemi Banks by Gbemi Banks
September 10, 2023
in Construction, Development, News
0

Minister of Works, Chief David Umahi expressed shock on Sunday at the sight of the gully erosion at Oba, a community in Anambra on the Onitsha-Owerri Expressway.

Umahi assured that the Federal Government would take urgent steps to ensure that the Owerri-bound side of the expressway was not severed as it had happened to the Onitsha-bound side.

“The magnitude of the gully at Oba is beyond the capacity of the Federal Road Maintenance Agency (FERMA) to reverse,’’ the minister, on a two-day inspection of federal roads in Anambra, said.

“This is a very difficult situation I must say. We will look at the possibility of diverting the drainage so as to save the other lane from getting cut off.

“I must say that this is a difficult situation because if we cannot divert the flood, we must divert the road,’’ he said.

Umahi emphasized that the permanent solution to the Oba gully erosion was to pile the two ends of the road, noting that such work could be done only during the dry season.

The minister noted that apart from Oba, two other serious gully erosion sites threatening the Onitsha-Owerri Expressway were at the Ozubulu end of the road.

Umahi also visited the 2nd Niger Bridge and commended the contractor for doing “nice and quality job’’.

He, however, directed the contractor to change the street lights installed on the bridge to solar street lights.

At Nnewi-Oba Road, the minister directed the contractor to suspend work and redesign the road to use concrete pavement to address obvious challenges.

Fielding questions from newsmen, Umahi advised Nigerians to be patient with President Bola Tinubu’s government on the execution of projects, especially roads.

“We need huge amount of money to fix roads.

“As a government, we are thinking out of the box to source money to ensure that things work.

“For instance, I am reviewing a number of projects to determine where we can cut cost,’’ Umahi said.

Tags: Anambra StateChief David UmahiOnitsha-Owerri Expressway
Previous Post

2023 AFCON: We played with maximum commitment to win – Peseiro

Next Post

Group commends AbdulRazaq over choice of cabinet members

Next Post

Group commends AbdulRazaq over choice of cabinet members

Gynix Afrika sensitises 100 girls about health, personal development

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

Why Tinubu addressed victims of Plateau attack at airport – Presidency

April 3, 2026
Tinubu and Yilwatda

Yilwatda: Plateau must never bleed again

April 3, 2026

WELA Requests Update On Alleged Sexual Violence in Delta, Calls for Ban on ‘Raping Festival’

April 3, 2026
Amupitan

INEC dismisses calls for Chairman’s removal, clarifies misconception over voter revalidation

April 2, 2026

APC to ADC: You are the architect of your misfortune

April 2, 2026

Adelabu’s Power Lines as Laundry Lines – Azu Ishiekwene

April 2, 2026

Why 57 properties linked to Malami should be permanently forfeited to FG – EFCC

April 2, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.