Saturday, November 1, 2025
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

FG partially shuts Third Mainland Bridge for 8 weeks repair

Gbemi Banks by Gbemi Banks
January 9, 2024
in News, Politics, Transport
0
FG partially shuts Third Mainland Bridge for 8 weeks repair
1.6k
VIEWS
Share on FacebookShare on TwitterShare on Whatsapp

The Federal Government on Tuesday partially shut the Iyana Oworonshoki-Adeniji Adele section of the Third Mainland Bridge, to begin  comprehensive rehabilitation works on the bridge.

The Federal Controller of Works, Lagos State, Mrs Olukorede Kesha, supervised the closure to mark the beginning of the rehabilitation.

The closure was done at the intersection where motorists coming from Ojota link the Third Mainland Bridge on the Island-bound carriageway.

Kesha was accompanied by the Sector Commander, Federal Road Safety Corps, Mr Kayode Farinloye; the Commissioner for Transportation, Oluwaseun Osiyemi; Commissioner of Police, Fayoade Adekoya, and other top officials.

She said the closure of the bridge would be done in two phases daily and traffic diverted to different carriageways at different times.

This, she said, was to give motorists opportunity to use the bridge while the rehabilitation works continued.

She explained that the Mainland in-bound Lagos Island lane would be open from 12.00 a.m. to noon, while those who intend to come from the Island to the Mainland will use Eko Bridge.

She added that from 12.00 p.m. to midnight, motorists would be able to access the bridge from the Island to the Mainland, while motorists from the Mainland heading towards the Island would have to use Eko or Carter Bridge.

Kesha said the rehabilitation works, which will include replacement of some expansion joints and total replacement of asphalt, would last between six to eight weeks.

She said the closure was part of the ongoing work that started in November, 2023, focusing on fixing the ramps, and some repairs on the remaining parts of the bridge, including the underdeck and lagoon sections.

“Motorists from Iyana Oworo, Toll Gate, Ogudu or Ibadan can no longer use this axis (Island Bound carriageway) so they will have to go through Gbagada, Anthony-Ikorodu-Road-Western-Avenue, Funsho Williams to Carter Bridge or Eko Bridge going forward but this is going to be a daily thing.

“So, in the morning, they have the access from 12 midnight to 12 noon the next day while in the afternoon, the Adeniji to Iyana Oworo bound have the free access from 1.00 p.m. thereabout till 12 midnight,” she said.

The controller said measures were in place, including radio jingles, to ensure motorists understand diversion points, to ensure seamless movement.

She said adequate road signs would be added around detour points at Ojota and Oworonshoki in addition to traffic managers’ deployment to reduce challenges of road users.

Keisha said that the scope of work would include complete removal and replacement of the asphalt of the deck to the standard two inches to make motoring smoother and safer on the bridge.

She said carefully chosen competent contractors on the project were going to work round the clock for speedy completion of the top deck work on the bridge.

“There will be 24 hours construction here, that is why it is fast-tracked to eight weeks,” the controller said.

She said that the Minister for Works, Mr David Umahi, was going to flag off rehabilitation works under the bridge at the weekend, so that simultaneously work would take place both on lagoon sections and the top deck.

Keisha expressed confidence that there would be seamless traffic flow and management because of the collaboration with the traffic and law enforcement heads who would be physically present.

She appealed to motorists to obey traffic rules and use alternative routes to prevent hardship as comprehensive repairs continued on the highway.

Osiyemi, on his part, expressed satisfaction with the collaboration between the state and federal government.

He said that 250 Lagos State Traffic Management Authority (LASTMA) personnel would be deployed to work with road safety officials on the project.

Also, the state Commissioner of Police promised top notch security for the project, while his FRSC counterpart promised to ensure all exits and links to the bridge were properly manned.

 

Some motorists who were the first set of people to be affected by the closure commended the government, but called for measures against hardship on the road.

Tags: Iyana Oworonshoki-Adeniji AdelelastmaMrs Olukorede KeshaThird mainland bridge
Share25Tweet16Send
Previous Post

Elephant trafficking: FG destroys 2.5 tones of confiscated wildlife stockpiles

Next Post

TB Joshua: Characters interviewed by BBC unknown to us – SCOAN

Related Posts

Our reforms in mining sector are successful – Dele Alake
Breaking News

Our reforms in mining sector are successful – Dele Alake

November 1, 2025
China 15th 5-Year-Plan and Future of China-Africa Cooperation, by Tunde Rahman
News

China 15th 5-Year-Plan and Future of China-Africa Cooperation, by Tunde Rahman

November 1, 2025
Ope-Davies at 60: Public presentation of seven books holds Thursday
News

Ope-Davies at 60: Public presentation of seven books holds Thursday

November 1, 2025
Next Post
Okotie: Fiery furnace of God's judgement approaching Nigeria, insists 'T.B. Joshua arguably one of the most lucid images of the Antichrist'

TB Joshua: Characters interviewed by BBC unknown to us - SCOAN

19 Gbosas for the Grandmaster of Data, by  Toni Kan

Globacom denies owing MTN interconnect charges

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

  • Shake-up in Nigerian Army: Generals Alabi, Haruna, Ilodibia, Shagaya, Adereti,  Adeyemo, Mala, Abdulsalam, Etsu-Ndagi, others get new postings

    Shake-up in Nigerian Army: Generals Alabi, Haruna, Ilodibia, Shagaya, Adereti, Adeyemo, Mala, Abdulsalam, Etsu-Ndagi, others get new postings

    74 shares
    Share 30 Tweet 19
  • Wole Soyinka banned from entering U.S.

    72 shares
    Share 29 Tweet 18
  • INEC Chairman appoints Adedayo Oketola as CPS

    72 shares
    Share 29 Tweet 18
  • DPO Ngbaronye dies after surgery

    70 shares
    Share 28 Tweet 18
  • Dangote Petroleum Refinery expands from 650,000bpd to 1.4m; needs 65,000 workers

    69 shares
    Share 28 Tweet 17
  • Bode George: Like 1962 Western Region crisis, court order stopping PDP convention can truncate this democracy

    68 shares
    Share 27 Tweet 17

Latest Stories

Our reforms in mining sector are successful – Dele Alake

Our reforms in mining sector are successful – Dele Alake

November 1, 2025
China 15th 5-Year-Plan and Future of China-Africa Cooperation, by Tunde Rahman

China 15th 5-Year-Plan and Future of China-Africa Cooperation, by Tunde Rahman

November 1, 2025
Ope-Davies at 60: Public presentation of seven books holds Thursday

Ope-Davies at 60: Public presentation of seven books holds Thursday

November 1, 2025
God saved me from assassination ‘to make America great again’ – Trump

Killings of Christians: Nigeria replies Trump

November 1, 2025
UBA to unveil Whitepaper on Africa’s Financial Infrastructure

Q3 2025: UBA delivers N538bn PAT, Robust Balance Sheet

October 31, 2025
Bode George condemns attack on Igbo, says ‘it is not our tradition in Lagos to discriminate against people’

Bode George: Like 1962 Western Region crisis, court order stopping PDP convention can truncate this democracy

October 31, 2025
Defection: PDP advises Fubara

Court stops PDP convention

October 31, 2025
Freedom Online

© 2025 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2025 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.